PURCON2023 Campus Development Programme Phase 1 - AWARD
UNIVERSITY OF EAST ANGLIA · East of England
Key facts
- Contract value
- £87,983,161
- Awarded
- 23 Jul 2024
- Contract starts
- 24 Jul 2024
- Contract ends
- 14 Jan 2027
- Procedure
- Other -
- Buyer type
- Education
- Source
- Contracts Finder
Awarded to
| Supplier | Value |
|---|---|
| Mace Limited | £87,983,161 |
Description
The University of East Anglia was created during the 1960s. Its original campus buildings were designed by the acclaimed architect Sir Denys Lasdun and several of the original buildings are now Grade II Listed, including the original teaching and science building the Lasdun Wall. The Grade II listed Lasdun Wall is an iconic and important part of University of East Anglia's (UEA) history situated in the centre of the UEA's vibrant and busy 24/7 campus. However, the building needs repair and refurbishment to address condition issues and to deliver essential sustainability improvements to enable the University to meet their target to be a net zero campus by 2045. The Lasdun Wall comprises four buildings constructed to appear as one (Building 3, Building 4, Building 5 and Building 6). The University plans to carry out a four-phase strip-back-to-frame refurbishment of the Lasdun Wall. This project - Lasdun Wall Refurbishment Phase 1 - will deliver new modern science facilities and teaching space in an extended Building 3, whilst existing science research facilities continue to operate within Buildings 4, 5 and 6. The existing science facilities are currently at risk due to potential condition failures of the buildings, therefore the success of Phase 1 to 'de-risk' highly specialised facilities within the Lasdun wall, is of extreme importance to the University.
The University's Phase 1 project consists of three elements
Preliminary enabling works (by others) The Main Works (the subject of this procurement) A package of interphase enabling works which will complete Phase 1 and prepare for the future decommissioning of Buildings
The appointed Main Contractor will be required to undertake the following:
Initial phase of strip out and asbestos removal will have been undertaken to provide an empty shell, however asbestos removal will be required by the main contractor as follows:
Facades - Around existing windows which will be replaced, and concrete façade panels removed to accommodate the new extension. Existing floor screed abutting the perimeter which includes asbestos contamination around existing fixings to the retained listed concrete façade panels - fixings and all remaining screeds will need to be removed. Within the tender design information, we have included the Asbestos survey report to support with the remaining asbestos removal, sequencing and overall methodology. All Asbestos must be removed.
Extension - An extension of approx. 2,966m² is planned to one elevation.
Window Replacement and Façade Treatment - The building is listed and the facades are a sensitive architectural feature which will need to be carefully replaced with modern windows in similar style.
Fitting Out of existing building - The re-fit comprises circa 11,287m² of space split to include science research facilities and teaching and social learning space.
External Works as detailed in the ISIT design i...
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202642 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202621 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202644 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved
Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, Farnham
Location: South EastBuyer: Waverley Borough Council
Open tenderCloses 30 Nov, 202626 daysValue £78.00kSource Find a TenderGuildford Borough Council is seeking to appoint a suitably qualified and experienced contractor to design, supply, install, test and commission a roof-mounted Solar Photovoltaic (PV) system at The Enterprise Centre, Farnham. The project forms part of the Council's commitment to reducing carbon emissions, improving ener
GH2011 Kitchen and Bathrooms Refurbishment
Location: United KingdomBuyer: Golding Homes
Open tenderCloses 20 Nov, 202616 daysValue £21.00mSource Find a TenderThis is a project for the refurbishment of kitchens and bathrooms to properties owned and managed by The Client for 3 years with the option to extend by further 2 years.
Framework Agreement for the Application of Mould Treatment
Location: WalesBuyer: City & County of Swansea
Open tenderCloses 4 Dec, 202630 daysValue £400.00kSource Find a TenderThe City and County of Swansea (the Employer) requires competent and experienced Contractors to deliver mould treatment works across its housing stock. The Framework Agreement will support the effective management of damp and mould in both occupied and void domestic properties, including communal areas, throughout Swa