Regenerative Schools Pilot - Innovation Lead
Department for Education · London
Key facts
- Estimated value
- £3,929,166
- Closing date
- 07 Jul 2026
- Contract ends
- 31 Mar 2030
- Procedure
- Open procedure
- Buyer type
- Central government
- Source
- Find a Tender
Description
The Department for Education and the Education Estates Strategy The Department for Education (DfE) is the UK government’s Department responsible for the schools in England. As part of this role, we oversee the safety, condition, and long‑term sustainability of the education estate. This includes ensuring that current and future school buildings are provided with safe, high‑quality environments where children can learn and thrive. On 11th February 2026 the Department published its 10-year plan for the Education Estate, the Education Estates Strategy, A decade of national renewal. The Regenerative Schools Pilot was outlined within the strategy: “Testing new solutions, technologies and construction methods – we will continue to look at how we can go further for our future design specifications as part of a research and development programme supported by £33 million to 2029-30. This will prioritise regenerative approaches looking at a wide range of outcomes from energy storage to bio-based construction materials, such as timber and working closely with Department for Environment, Food and Rural Affairs (DEFRA) on the Timber in Construction Road Map.” This is your opportunity to shape this cutting‑edge project, which will guide the Department’s work over the next ten years and beyond. Regenerative Schools Pilot, Introduction The Department for Education intends to research, develop, and deliver a series of single and dual classroom, ultra‑low‑carbon school buildings under the Regenerative Schools Programme. This will be accompanied by a package of landscaping and retrofit interventions which will support biodiversity, passive heat‑reduction (such as tree shading), fabric upgrades to existing buildings (cladding and windows), sustainable drainage systems and the creation of outdoor learning spaces. This programme will also produce case studies, guidance and resources for schools. As part of the Regenerative Schools Programme, the Department intends to appoint two parties in August 2026: an Innovation Lead and an Academic Adviser. These organisations will produce feasibility studies, research the building materials and techniques required to produce ultra‑low‑carbon school buildings and develop 6 standard designs. Then, in March 2027, the Department plans to appoint a contractor to deliver the works, using the materials and methods specified by the Innovation Lead and Academic Advisers. Separate market engagement and tender events will be held for the construction contractor’s appointment.
The Innovation Lead The Innovation Lead will serve as the Department’s primary technical partner, guiding the programme from its earliest feasibility work through to the delivery of completed buildings. Your work will include developing an understanding of each school site, identifying opportunities for nature‑led retrofit, and delivering 6 standardised concept designs for new single and dual external classroom pods, ultra‑low‑carbon buildings that meet demanding embodied carbon targets. You will explore and develop a range of regenerative material strategies, produce clear and accessible design material, and provide the technical direction needed to ensure that the Department’s ambitions for low embodied carbon, buildability and replicability are embedded from the outset. As the programme moves from concept into development, the Innovation Lead will take on a client‑side assurance role, overseeing the Contractor’s design under the Pre‑Contract Services Agreement and ensuring alignment with carbon targets, safety standards, and the Department’s technical requirements. During the delivery phase you will provide project management and technical assurance, monitor the quality of off‑site manufacture and on‑site installation, support statutory compliance, and ensure that handover, commissioning, and early operation run smoothly. You will also be responsible for producing technical guidance, case studies, and updated documentation so that learning from the programme can be scaled across the wider education estate. Working with the Academic Adviser The Innovation Lead and Academic Adviser are intended to operate in parallel, each with a distinct focus but with close coordination throughout. The Innovation Lead will ensure technical feasibility, safety, and low‑carbon performance, while the Academic Adviser will ensure that the programme responds to the needs and experiences of the schools and communities involved. Together you will provide the Department with the combined academic, social, and technical expertise required to develop a set of replicable, ultra‑low‑carbon solutions that are grounded in real‑world school environments and capable of informing future national delivery. Please refer to the engagement section of this notice to register for our market engagement events.
Categories (CPV)
- 71000000 Architectural, construction, engineering and inspection services
- 71621000 Technical analysis or consultancy services
- 71500000 Construction-related services
- 71540000 Construction management services
- 71313000 Environmental engineering consultancy services
- 73100000 Research and experimental development services
- 73300000 Design and execution of research and development
- 90700000 Environmental services
Similar open tenders
Lisnamult Access Road N63
Location: IrelandBuyer: Roscommon County Council
Open tenderCloses 3 Dec, 202628 daysValue €865.00KSource TEDConsisting of a new access road from the N63 to the townland of Lisnamult to access land with a potential for housing development. The project aims to provide active travel facilities
Ireland West SDZ Designated Activity Company DAC is seeking consultancy services to support the development of an Aviation Circular Economy Hub at Ireland West Airport Knock.
Location: IrelandBuyer: Mayo County Council
Open tenderCloses 24 Nov, 202619 daysValue €125.00KSource TEDMCC are publishing this competition on behalf of Ireland West SDZ Designated Activity Company. The brief is to undertake the market validation, technical, commercial and operational planning development work necessary to establish the proposed Hub’s viability. The tenderer shall identify an appropriate operating model
Provision of Site Assessment Services to the Abbey Theatre
Location: IrelandBuyer: Abbey Theatre Amharclann na Mainistreach
Open tenderCloses 9 Dec, 202634 daysValue €139.00KSource TEDThe procurement of services to carry out a Building Condition Survey, which documents the building prior to change and gives an independent opinion on its condition as well as recommendations for the level of intervention required to meet the operational, accessibility, sustainability and technical requirements of a mo
Provision of Water Framework Directive (WFD) Related Services 2027 and 2028-2030 Inclusive
Location: IrelandBuyer: Waterways Ireland
Open tenderCloses 11 Dec, 202636 daysValue €390.00KSource TEDThe Water Framework Directive (WFD), Directive 2000/60/EC, was adopted in 2000 as a single piece of legislation covering rivers, lakes, groundwater and transitional (estuarine) and coastal waters. Its objectives include the attainment of good status in water bodies that are of lesser status at present and retaining goo
Lifford- Stranorlar Community Trails Plan
Location: IrelandBuyer: Ballybofey and Stranorlar Integrated Community Company
Open tenderCloses 24 Nov, 202619 daysValue €24.50KSource TEDBassic Enterprise wish to appoint suitably qualified and experienced professional services and as such now seek quotations from suitably qualified consultants to develop and deliver a Community Trails Plan for the Lifford-Stranorlar Municipal District in County Donegal.
Westgate Vision 2040 - Multi-Disciplinary Design Team (MDDT) Consultancy Service
Location: IrelandBuyer: Louth County Council
Open tenderCloses 25 Nov, 202620 daysValue €900.00KSource TEDDelivery of detailed design, tender and management of construction phase to handover for Westgate Vision Public Realm Scheme Character Area 1 and 2