Central Library Fire Door Replacement
Milton Keynes Council · South East
Key facts
- Closing date
- 06 Dec 2024
- Contract starts
- 17 Feb 2025
- Contract ends
- 07 Mar 2025
- Procedure
- Open procedure (below threshold)
- Buyer type
- Local government
- Source
- Contracts Finder
Description
The works consist of the removal and replacement of a series of defective fire doors. To undertake upgrading of the fire stopping and fire walls. To erect a fire lobby and to install directional exit signage, all within the roof void of the Central Library. The extent of the works is laid out within the Schedule of Works and are summarised below:
Within Milton Keynes Central Library roof void, there are 2 types of fire break walls, these being: Wall type 1 - are the original Lightweight timber stud wall (double wall) with a 12mm plasterboard panels sandwiched in between. The Stud wall built to underside of steel beam. Above the beam, there are softwood truss rafters , again these are twinned up with 12mm plasterboard panel sandwiched in between. These roof trusses above the steel beams and the timber studworks underneath the beam are clad in visqueen clear plastic sheeting. Wall type 2 are the later installed vertical mineral fire blankets, which have been suspended down form the pitched roof and lap on to the ceiling line. It transpires that the number of these additional fire breaks was excessive and compromised the means of escape. In both walls there are short (average 600 x 800mm fire doors) installed to assist movement between these break wall off a gantry. The walls which are to be retained, and have new fire door installed and upgrading of fire stopping are: Walls - B, C, E, H, J and K The walls which are to be retained, but no longer to be designated as fire break walls and are to have the fire doors removed are: Walls - A, D up to the abutting fire stopping around the Atrium, F and G. Further works Electrical intake and switch room and the old water tank mezzanine floor above. In this area, the contractors is to remove all defective patch repairs to stud walls and fully make good and fire stop around all structural and services breaches and around all wall/floor and wall/pitch roof perimeters. The remedial works are to achieve a minimum of 90mins fire stopping throughout this room and be Certified. To strip out existing door and frame set leading into Roof void at point L9 and replace with a new FD30S fire door and frame set. Staircase into Roof void and above protected stair well. In this area, the contractor is to supply and fit fire blanket from the underside of the roof timber decking down to and onto to the inner face of the blockwork walls on 3No elevations. On the ply lined timber studwork and blockwork wall between stairwell and roof void, the contractors is to supply and fit fire blanket from the underside of the roof timber decking down to and onto to face of the plywood lined studwork and to the top of blockwork walls on this elevation New Lobby in Roof void In this area, the contractor is to construct a new fire rated lobby area. This lobby is to be constructed on the gantry floor and to the roof pitch line. The tender documents and drawing are ...
Additional information: For any suppliers interested in this opportunity please visit our e-Tendering portal - https://in-tendhost.co.uk/milton-keynes/aspx/Home
Is a Recurrent Procurement Type? : No
Categories (CPV)
Similar open tenders
Tender 23/2026 - SUPPLY AND DELIVERY OF WORKSHOP TOOLBOXES COMPLETE WITH TOOLS
Location: Northern IrelandBuyer: Newry, Mourne and Down District Council (NMD)
Open tenderCloses 2 Dec, 202628 daysSource Find a TenderNewry, Mourne and Down District Council invite suppliers to tender for the provision of a total of 10 toolboxes complete with tools. This is to equip the workshop personnel with the appropriate tooling to maintain Council vehicles, plant, and equipment to a high standard in line with industry guidelines and statutory r
BBV Sublot 4 - HSST1020 - SALTLEY VIADUCT GABION WALL
Buyer: Balfour Beatty VINCI JV HS2
Open tenderCloses 13 Nov, 20269 daysValue £1.00mSource Contracts FinderOpportunity Summary - Gabion Retaining Wall Works We are seeking experienced suppliers and subcontractors to provide the supply, delivery and installation of a gabion retaining wall system as part of a civil engineering project. Scope of Requirements The successful supplier shall be responsible for: Supply
Supply of EURO Heavyweight and Lightweight Pallets for West Midlands Fire and Rescue Authority 2026 - 2030
Location: United KingdomBuyer: West Midlands Fire and Rescue Authority
Open tenderCloses 4 Dec, 202630 daysValue £250.00kSource Find a TenderWest Midlands Fire and Rescue Authority (the Authority) is seeking to award a Contract for the provision of Euro Heavyweight and Lightweight pallets.
Provision of Surface Dressing Chips
Location: ScotlandBuyer: Tayside Contracts
Open tenderCloses 2 Dec, 202628 daysValue £500.00kSource Public Contracts ScotlandTayside Contracts requires suitably experienced Suppliers to provide a reliable, responsive and cost-effective supply of Surface Dressing Chips for use on annual road maintenance and surface dressing programmes undertaken on behalf of Angus Council, Dundee City Council, Perth & Kinross Council and other external client
Dunsallagh/Killernan GWS Civil Engineering works to upgrade infrastructure
Location: IrelandBuyer: Dunsallagh/Killernan GWS
Open tenderCloses 16 Nov, 202612 daysValue €460.00KSource TEDDunsallagh/Killernan GWS are undertaking an upgrade of approx 5km section of existing 2" watermain to 4". Section A. Approximately 2.6km, from Doonsallagh West to the R474. Section B. Approximately 2.5km of roadway, from the junction of Knockbrack road and the R427 heading west. The works will require consulting engine
ITT for Supply of Windows & Doors for Individuals Batch 05 (T1398)
Location: ScotlandBuyer: Dundee City Council
Open tenderCloses 4 Dec, 202630 daysValue £220.00kSource Find a TenderManufacture, supply and delivery of uPVC windows and doors for Individuals Batch 05. This contract is for supply only as installation will be undertaken by DCC Construction Services.