RiGB - footprint project (decarbonisation works)
Key facts
- Estimated value
- £3,000,000
- Closing date
- 13 Mar 2025
- Contract ends
- 28 Nov 2025
- Procedure
- Below threshold - open competition
- Buyer type
- Local government
- Source
- Find a Tender
Description
The Royal Institution resides in a Grade I listed building located on Albemarle Street, Mayfair within the City of Westminster. Project Description The Royal Institution's mission for over two centuries has been to connect people with science on a global scale. As an independent registered charity, the Ri is committed to science education, public engagement, and heritage activities, catering to diverse audiences worldwide. Entering a new strategic phase, the Ri envisions science accessible to all, believing in its transformative power across various aspects of modern life. As advocates for equitable access to science, the Ri bridges the gap between the public and scientists, nurturing curiosity, exploration, and engagement. It serves as a welcoming home for science enthusiasts of all backgrounds. To support this goal Ri has secured £4.35 million in funding from the Greater London Authority (GLA) for its Footprint Project to reduce the environmental impact of the building. This funding will be the catalyst for a comprehensive retrofit of the building, including the improvement of building plant, services and systems and sensitive enhancement of building fabric. The Footprint Project should serve as a precedent for successfully retrofitting a Grade I listed building to mitigate environmental impact and provide climate resilience. Ri project objectives • Upholding the Institution's core values as expounded in their strategic vision, to ensure openness, equitable access, and wide participation by the public. • Minimise the environmental impact of the organisation. • Conserve and repair the building fabric for future generations. • Chart a course to net-zero emissions, partnering with Imperial College London. • Addressing energy consumption and waste within the organisation. Project scope Proposals have been developed through: • An understanding of the programme and mandatory requirements from the GLA as funder, essentially to ensure 35% reduction in operational carbon and reach an EPC rating of C (from current EPC of G). • A road map to net zero strategy informed by following the energy hierarchy and energy utilisation metrics to ensure the long-term sustainable improvement of the building and how it is experienced and used. • Provision of an holistic, incremental and integrated approach, prioritizing works based upon tangible benefit, where any maladaptation is avoided, and where no works prejudice the successful delivery of those to follow. • Appreciation of the Ri as a working building with constraints around how and when work can be carried-out. In optimising the project scope and ambition with the heritage and immediate GLA funding and key programme drivers, the design team has made recommendations on how the works could be phased. The works are planned to commence as soon as possible after 2nd June 2025 award date and a Listed Building Consent Application has been submitted on 28th February 2025 to enable those works. The Royal Institution will require excessively noisy works and those that will affect the use most of the internal areas to be carried out during a 6 weeks operationally reduced activity period for the Ri commencing on 25th July 25 and ending on 5th September 25. At present the works to be executed during this operationally reduced activity period are as follows :- Builders work (including roof penetrations for ducting) and access hatch Metalwork replacement Balustrades ASHP installation only AHU installation only Steelworks and roof penetration for Louvres Waterproofing/making good of roof Radiators, air curtains replacement including connecting and adapting to existing pipework and cabling Making good works related to new radiators and air curtains to a like for like condition Window films LED Lighting to front of house rooms BMS works Glazed doors and screens Fire stopping and decommissioning gas connection in kitchen Renewing some kitchen equipment (replacing gas appliances with electric) The remaining works that can be completed during the period after the 5th September up to 28th November 25 are currently considered to be as follows :- VrF installation to No. 20 Roof internal insulation ASHP (on roof) connecting to power and commissioning AHU (on roof) connecting to power and commissioning Louvres installation BMS commissioning Directors' Flat works LED lighting to back of house rooms and external areas Tenders will be sought on a fixed price basis. The form of contract will be JCT Standard Form of Building Contract without quantities 2024 with amendments. The contract will also contain some Contractor Design Portions. The timeline for selecting a contractor shall be as follows :- Issue Notice with SQ - 5th March 25 Date for returning SQ - 13th March 25 Reviewing SQs and selection of tenderers - 20th March 25 Issuing ITT to selecting tenderers - 21st March 25 Tender return date (ITT) - 21st April 25 Target contract Award - 2nd June 25 This notice invites contractors to complete and submit the selection questionnaire attached to this notice. This should be returned to D R Nolans & Co ltd via email by 5pm (GMT) on Thursday 13th March 25 as noted above. The SQ includes questions relating to the tenderers business, financial standing, ability to act as Principal Contractor under the Building Safety Act, compliance as well as quality questions. The scoring is indicated on the SQ form. Copies of work in progress Stage 4 drawings prepared by the Architect (BDP), MEP Engineer (Harley Haddow) and Structural Engineer (Price & Myers) attached for information regarding the scope of works. Other principal consultants involved in the projects are Project Managers (Gardiner & Theobald) and Cost Consultant (D R Nolans & Co). The SQs received will be reviewed and scored and a maximum of five contractors will be invited to submit full tenders for the works in accordance with the timings noted above.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202643 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved
Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, Farnham
Location: South EastBuyer: Waverley Borough Council
Open tenderCloses 30 Nov, 202625 daysValue £78.00kSource Find a TenderGuildford Borough Council is seeking to appoint a suitably qualified and experienced contractor to design, supply, install, test and commission a roof-mounted Solar Photovoltaic (PV) system at The Enterprise Centre, Farnham. The project forms part of the Council's commitment to reducing carbon emissions, improving ener
GH2011 Kitchen and Bathrooms Refurbishment
Location: United KingdomBuyer: Golding Homes
Open tenderCloses 20 Nov, 202615 daysValue £21.00mSource Find a TenderThis is a project for the refurbishment of kitchens and bathrooms to properties owned and managed by The Client for 3 years with the option to extend by further 2 years.
Framework Agreement for the Application of Mould Treatment
Location: WalesBuyer: City & County of Swansea
Open tenderCloses 4 Dec, 202629 daysValue £400.00kSource Find a TenderThe City and County of Swansea (the Employer) requires competent and experienced Contractors to deliver mould treatment works across its housing stock. The Framework Agreement will support the effective management of damp and mould in both occupied and void domestic properties, including communal areas, throughout Swa