GB-Edinburgh: Refurbishment of Fife Ness Lighthouse
Northern Lighthouse Board · Scotland
Key facts
- Estimated value
- £100,000
- Closing date
- 22 Jul 2024
- Contract starts
- 30 Jul 2024
- Contract ends
- 30 Sep 2024
- Procedure
- Open procedure
- Buyer type
- Central government
- Source
- Contracts Finder
Description
Fife Ness Lighthouse is at an elevation of 12m and a position of 56º 16.17' N, 02º 35.10' W. The character of the light is flashing white and red every 10 seconds with a range of white 21miles and red 20 miles. The lighthouse sits on a rock outcrop, which falls approximately 3m down to the shore to the south around the lightroom area. The station is bounded by a 2m concrete post and mesh fence topped with 3 layers of barbed wire. There is a tarmac track from the entrance gate up to the station entrance. The Lighthouse is a single storey building that consists of lantern room, control room and battery room. The light was first established in 1975. The proposed works principally involves the repair of and defective items and application of decorative / protective coatings to all external /internal surfaces of the structure. More specifically, the main items of project work are as listed below:- 1. Carry plant, tools and materials to site. 2. Ensure contractors own site welfare facilities accessible. 3. Carry out an Asbestos Refurbishment / Demolition Survey on the structure prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health & Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts' guide for sampling, analysis and clearance procedures" and HSG264, Asbestos: The survey guide. A copy of the report must be issued to the Engineer prior to work commencement. 4. All licensed removal work must be carried out by Asbestos Removal Contractors who are in possession of a current asbestos license issued by the Health and Safety Executive and who are members of the Asbestos Removal Contractors Association (ARCA). Asbestos Removal Contractors must be assessed in advance by the NLB QHSE department. 5. External work (Lighthouse Station) Wash down prepare and paint externally. Replace entire security fence. Remove obsolete emergency optic. Minor building refurbishment works. 6. Internal work (Lighthouse Station) Washdown, prepare and paint internals of lighthouse. Minor building refurbishment works. 7. Remove rubbish off site on a regular basis, photographs of welfare facilities to be provide to NLB at the start and end of each trip to ensure basic hygiene levels are met. 8. The Contractor must supply the NLB Project Leader with 'as-built' drawings and information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations. Programme The contractor must submit a works programme, at tender stage with a proposed start date for the sequence of works within this project. It is anticipated that the programme of scheduled works will start in July/August 2024 and take place over a period of 8 weeks. A mandatory site visit is scheduled for 24 July 2024. This is compulsory for all tenderers.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Categories (CPV)
Similar open tenders
EEAST - Refurbishment of Clacton Ambulance Station (26-T24)
Location: East of EnglandBuyer: East of England Ambulance Service NHS Trust
Open tenderCloses 27 Nov, 202622 daysValue £129.00kSource Find a TenderThe East of England Ambulance Service NHS Trust is issuing an Invitation to Tender in connection with a competitive procurement for the Refurbishment of Clacton Ambulance Station
St Edmunds College Water Waste and Pump Service Contract
Location: East of EnglandBuyer: ST EDMUND'S COLLEGE CAMBRIDGE
Open tenderCloses 19 Nov, 202614 daysSource Find a TenderSSC Partnership (the Agent) on behalf of St Edmunds College, University of Cambridge are currently out to tender for the provision of Water Waste and Pump Services. This procurement is being run under the open procedure, which is a formal bidding procedure, under which the contract is advertised, and all interested org
T26-143CAP Currynierin Community Park Contractors PQQ Application
Location: Northern IrelandBuyer: Derry City and Strabane District Council
Open tenderCloses 4 Dec, 202629 daysValue £1.50mSource Find a TenderDerry City and Strabane District Council seeks tenders from suitably qualified contractors for the provision of a new 1.75ha community park, which includes an enclosed play facility, a natural grass kick-about/pitch facility and a network of lit footpaths at Currynierin, Waterside, Derry/Londonderry. The proposed works
Replacement of Windows & Doors & Associated Works
Location: South EastBuyer: Canterbury City Council
Open tenderCloses 27 Nov, 202622 daysValue £900.00kSource Find a TenderCanterbury City Council wishes to select and appoint a suitable supplier for the provision of Replacement of Windows & Doors & Associated Works and invites tenderers to submit a tender to meet the Council’s requirements. The Contract is anticipated to commence December 2026 / January 2027 and will continue for a period
Contract for Renewal of Windows & Doors works
Location: WalesBuyer: City & County of Swansea
Open tenderCloses 3 Dec, 202628 daysValue £199.00kSource Find a TenderContract for Renewal of Windows & Doors works at Penlan
GL RFCA Kitchen Refurbishments - St Johns Hill Battersea ARC and White City ARC
Location: LondonBuyer: Reserve Forces' and Cadets' Association for Greater London
Open tenderCloses 23 Nov, 202618 daysValue £144.50kSource Find a TenderBelow threshold procurement - by invitation only. For this opportunity we are only inviting bids from suppliers who are on-boarded to both the Central Digital Platform and our own finance system, Symphony. This is intended to avoid delaying the delivery of the works, as the on-boarding process can take some time. Only