Closed tender
Published 16 Sep 2024

Bird Deterrant Netting C4 - KCSL

Kilnbridge Construction Services Ltd

Key facts

Estimated value
£250,000
Closing date
20 Sep 2024
Contract starts
29 Aug 2025
Contract ends
31 Aug 2028
Buyer type
Other public body

Description

Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various roofing and external envelope systems to satellite buildings around the station complex. Those buildings include the following:

• South Portal • North Portal • Cycle Hub • East Core • West Core • East & West Vents

Part of the scope of works includes the design, manufacture, supply and installation of bird deterrent netting to the external areas of the buildings which comprise of the following listed below

• Stainless steel grade 316 (grade 1.4401) netting • The system shall include all fixings, straps, clips, springs and any other accessories required to install the netting to the primary or secondary structure to the required specification. • Must meet the requirements for durability set out within the specification. • Works include also mock ups, samples and quality benchmarks.

The Works shall effectively and reliably keep the façade and roof areas free from:

• Bird habitation • Bird perching • Bird fouling

The Works shall comply fully with the requirements of:

• The Department for Environment, Food and Rural Affairs (Defra). • The Royal Society for the Prevention of Cruelty to Animals (RSPCA). • The Royal Society for the Protection of Birds (RSPB). • The Wildlife and Countryside Act 1981.

The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing (if req'd), manufacture and installation of bird deterrent systems

The Subsubcontractor will be responsible for progressing the schedule and associated Stage 4 drawings through design for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.

The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the finished systems were required.

Roof covering 1600+ sqm.

Expected Subsubcontract award Jan 25

Construction is to be carried out over a 2.5 year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.

Categories (CPV)

Similar open tenders

About Kilnbridge Construction Services Ltd

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder (Open Government Licence v3.0). Always read the original notice before responding.