GB-Edinburgh: Fabrication of Solar Array, A-Frames and Pedestals - Hyskeir
Northern Lighthouse Board · Scotland
Key facts
- Contract value
- £137,728
- Awarded
- 15 Jan 2024
- Contract starts
- 16 Jan 2024
- Contract ends
- 15 Mar 2024
- Procedure
- Open procedure
- Buyer type
- Central government
- Source
- Contracts Finder
Awarded to
| Supplier | Value |
|---|---|
| JGC Engineering & Technical Services Ltd | £137,728 |
Description
Specification of Requirements
Solar Array and A-Frames: Fabricate 6.4m high x 12m x 4m aluminium framework with access ladders leading to A-frames on two working platforms finished with a GRP deck and handrail as detailed on NLB contract drawings.
Pedestals: Fabricate two number aluminium pedestals to support the Racon monitoring system and two number aluminium pedestals to support the LED Optics as detailed on NLB contract drawings.
General: On completion of the fabrication works, a trial assembly is to be carried out at the suppliers premises to allow the Project Leader and / or his representative the opportunity to inspect individual structural members for acceptability, to check the proposed sequence of erection for safety, and to measure the expected duration of operations on site.
Following the trial assembly the supplier should dismantle the structures, then schedule and co-ordinate the delivery and transportation of all components and other commodities to NLB (Oban) Base prior to Friday 15 March 2024.
Programme All tenderers must submit a manufacturing and production plan , at tender stage, with a proposed start date during the week commencing Monday 15 January 2024. It is proposed that the fabrication works should take place over a period of 8-10 weeks and delivery of all items within the bill of quantities must be made to NLB's depot in Oban before Friday 15 March 2024.
Tenderers should also advise of any anticipated delays or advancement of the fabrication works programme and incorporate all relevant lead-in times for materials, proprietary items, etc.
The tenderers programme shall clearly set out the sequence of fabrication and proposed time limit within each operation giving the dates of commencement and completion. The tenderer in preparation of this programme shall take cognisance of work by sub-contractors, and availability of materials, transportation and all other matters related to the works. On agreement or negotiation of the programme by the Project Leader, the tenderer will be responsible for the execution of the work in conformity therewith.
Submission of the programme will not relieve the tenderer of his responsibility to apply in writing for instructions, drawings etc. in accordance with the agreed contract terms and conditions. The tenderer shall record progress on a copy of the programme kept on his premises. The tenderer must also update or redraft the programme without delay if any circumstances arise, which affect the progress of the works and submit copies of all revisions to the Project Leader immediately.
For a more detailed description please refer to the Tender Document.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Categories (CPV)
- 45255400 Fabrication work
Similar open tenders
Door Entry Phased Replacement Programme 2026-27
Location: LondonBuyer: London Borough of Hillingdon
Open tenderCloses 2 Dec, 202627 daysValue £200.00kSource Find a TenderThe London Borough of Hillingdon (LBH) intends to install/upgrade the Door Entry/Access Control to 40 low and medium rise blocks. This work will be based on a planned program. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete and fully functional audio door
Crane Provision Framework
Location: South EastBuyer: KBS Maritime Ltd
Open tenderCloses 3 Dec, 202628 daysValue £4.00mSource Find a TenderKBS Maritime is seeking to establish a multi-supplier Framework for complete third-party crane services in support of Alongside Services operations. The Framework will supplement, not replace, KBS internal Heavy Lift capability and will provide planned surge, operational resilience, out-of-hours support, concurrent-lif
lumbing PPM and reactive repairs for Hertfordshire Police
Location: East of EnglandBuyer: The Police and Crime Commissioner for Hertfordshire
Open tenderCloses 3 Dec, 202628 daysValue £371.50kSource Find a Tenderlumbing PPM and reactive repairs for Hertfordshire Constabulary
Allotment Track Repairs
Location: South EastBuyer: Gosport Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £65.00kSource Find a TenderGBC is inviting quotations for the supply, delivery and installation of track repairs at Brockhurst Allotment, Manor Way Allotment, and Middlecroft Allotment.
UKREiiF Stand Design and Build
Location: ScotlandBuyer: Glasgow City Council
Open tenderCloses 9 Dec, 202634 daysValue £150.00kSource Public Contracts ScotlandGlasgow City Council is seeking to appoint a company to design, build and deliver an exhibition stand on behalf of Invest Glasgow at The UK’s Real Estate Investment and Infrastructure Forum (UKREiiF) for the next three years. In 2027, the event will take place in the Royal Armouries Museum in Leeds, from 18-20th May. F
Electrical Rewire and associated work at Duncan Mills Memorial Slipway in Balloch
Location: ScotlandBuyer: Loch Lomond & The Trossachs National Park Authority
Open tenderCloses 7 Dec, 202632 daysValue £100.00kSource Public Contracts ScotlandElectrical Rewire and associated work at Duncan Mills Memorial Slipway in Balloch