Skip to content
Tenfell
Closed tender
Published 09 Aug 2026

Mary Immaculate College - Tailteann T2 Building Gym

Mary Immaculate College · Ireland

Key facts

Estimated value
€800,000
Closing date
07 Sep 2026
Procedure
Open procedure
Buyer type
Education

Description

The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office and the removal and replacement of existing lighting. Mechanical works include new air conditioning works, including new outdoor units, new ducting

Categories (CPV)

Similar open tenders

About Mary Immaculate College

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on TED (Tenders Electronic Daily) (EU open data (Decision 2011/833/EU)). Always read the original notice before responding.