Skip to content
Tenfell
Closed tender
Published 03 Aug 2023

Exhibition stand design and build - Energy Innovation Summit 23

KNOWLEDGE TRANSFER NETWORK LIMITED · London

Key facts

Estimated value
£90,000
Closing date
04 Sep 2023
Contract starts
10 Sep 2023
Contract ends
30 Nov 2023
Procedure
Competitive quotation (below threshold)
Buyer type
Central government

Description

Innovate UK KTN connects innovators with new partners and opportunities beyond their existing thinking - accelerating ambitious ideas into real-world solutions.

We want to appoint a suitably qualified exhibition design company to design, manufacture, instal and derig an exhibition stand for the Energy Innovation Summit. We will work closely with the chosen company to develop and realise the stand in a creative and impactful way that is relevant and accessible to our audiences.

Innovate UK is organising a cross-government stand at the Energy Innovation Summit at the Exhibition Centre, Liverpool, 31 October - 1 November 2023. Innovate UK KTN will be leading on the design and build and management of the stand.

The 150m2 stand is shown at K3 on the attached floor plan. The final representatives on the stand will be finalised during the coming weeks.

This will be an opportunity for significant brand positioning and awareness for Innovate UK and display of its brand must be a primary consideration.

Objectives • Inspire - connect with the audience • Create a stand that is engaging and showcases the impact innovation has on the UK economy and the energy sector • Provide a showcase for Innovate UK and partners • Put the UK government at the heart of the UK's energy innovation landscape

The stand should meet the objectives outlined above, appeal to the specific target audiences and meet our requirements for brand visibility and accessibility. Exhibition space to include: • Area to showcase physical demos • Up to 3 individual semi-private meeting pods • Networking area • Speaker area and associated A/V • On-stand displays of digital content • Limited on-stand storage • Production of impactful graphics

Build Following sign-off of detailed designs, the successful agency will undertake production design and specification of all exhibition elements. They will need to ensure the build is durable and is easy to clean. The structures must be compliant with relevant statutory and non-statutory requirements e.g. Health & Safety regulations, Equality Act legislation, be constructed of fire retardant materials and follow best practice procedures. We would like to see the use of sustainable, reusable materials wherever possible.

Budget Please break down the costings to include the design, production, transport, build and derig within a £70k + VAT ceiling. £20k + VAT should be ring-fenced for in-event costs.

Outputs All rights (including ownership and copyright) will pass to Innovate UK KTN on completion of this project.

Exclusions: - Content management

Please apply by 4 September to [email protected] with a proposal with your company details, experience of similar sized design and build contracts, confirmation of availability for the project, suggestions of materials to ensure we adhere to Net Zero best practice, a budget and a timeline.

Submissions will be assessed on an ongoing basis until this date.

Categories (CPV)

Similar open tenders

About KNOWLEDGE TRANSFER NETWORK LIMITED

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.