Skip to content
Tenfell
Upcoming
Published 18 Sep 2026

North Wooton Pump and Pre-Cast Concrete Units Supply

Kings Lynn Internal Drainage Board · East of England

Key facts

Estimated value
£390,000
Engagement closes
20 Oct 2026
Contract ends
01 Sep 2027
Procedure
Competitive flexible procedure
Buyer type
Local government

Description

This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project. The value is estimated at circa £390,000 total. These figures are exclusive of VAT. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Management Alliance (WMA) will oversee this procurement on behalf of the King’s Lynn Internal Drainage Board working with Turner & Townsend as advisors.

Categories (CPV)

Similar open tenders

About Kings Lynn Internal Drainage Board

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Find a Tender (Open Government Licence v3.0). Always read the original notice before responding.