Anglian Water Fens and Lincolnshire Reservoirs Early Works Partner (EWP)

Anglian Water Services Ltd · East of England

Key facts

Engagement closes
30 Nov 2026
Contract ends
30 Jun 2032
Buyer type
Utilities & transport

Description

AWS is facing unprecedented challenges due to climate change, population growth and environmental constraints. These challenges include more frequent droughts, increased demand for water, and the need to reduce water abstraction from environmentally sensitive areas. To address these challenges, the Water Resources East regional planning and the Water Resource Management Planning of Anglian Water and Cambridge Water have selected the Fens Reservoirs (FR) and Lincolnshire reservoir (LR) schemes as low-regret Strategic Resource Options (SRO) to improve water security and meet societal and environmental outcomes. The reservoirs will provide safe, resilient supplies of drinking water, as well as environmental, socioeconomic, leisure, and wellbeing benefits for the communities they serve. FR and LR will be delivered to the benefit of both AWS and Cambridge Water (CWC) customers. The FR and LR and associated assets (abstraction, treatment and transfers) are being progressed through the fast-tracked delivery framework overseen by the Regulators' Alliance for Progressing Infrastructure Development (RAPID), and each is proposed to be a Nationally Significant Infrastructure Project (NSIP) seeking consent through the Development Consent Order (DCO) regime. Due to the size and complexity of the programme, Specified Infrastructure Project Regulations (SIPR) is the preferred delivery model for the reservoirs. SIPR was introduced by the UK Government in 2013 as a mechanism for an alternative approach to financing and delivering large and complex water and sewerage infrastructure projects. Under SIPR, the Secretary of State (SoS) or Ofwat (under delegation from the SoS) may specify an infrastructure project for delivery under a "project licence" by a third party where certain conditions are met. Early Works are the preparatory activities; site investigation works and construction tasks to be completed prior to Development Consent Order (DCO) determination and commencement of Enabling Works and Main Construction Works. The works will comprise preparatory statutory, technical, and construction activities required to support the obtaining of the necessary consents prior to DCO determination. Anglian Water are considering the following activities as part of the EWP Framework scope where the EWP will act as the Principal Contractor (PC), where it is reasonably practicable. Principal Contractor Services – Overall site coordination, health and safety management, logistics and contractor management. Duty under CDM. Site Management & Logistics – Site operations, welfare, security, access management and logistics controls. Site Establishment & Compounds – Establishment and operation of site compounds, welfare facilities and supporting infrastructure. Constructability & Design Coordination – Construction planning, buildability reviews and coordination with design development activities. Environmental Mitigation – Delivery of environmental mitigation measures required to support the programme. Ecological Mitigation & Monitoring – Habitat creation, species protection works and ecological monitoring activities. Archaeology, Heritage & Geophysical Investigations – Archaeological investigations, heritage works and geophysical surveys. Water Surveys – Water level and quality monitoring Topographical & Utility Surveys – Topographical surveys, utility detection, mapping and verification activities. Geotechnical Investigations – Ground investigations, testing and reporting. Environmental Surveys – Environmental baseline and compliance surveys. Ecological Surveys – Ecological surveys supporting environmental assessment and mitigation requirements. UXO Investigations – Unexploded ordnance surveys and investigations. Temporary Traffic Management – Temporary traffic management, road closures and associated highway measures. Site Discharge & Consenting Support – Delivery of drainage and discharge infrastructure and support to consent compliance activities. Temporary Works – Design, management and assurance of temporary works. Property Management & Dilapidation Surveys – Property-related activities, condition surveys and management of affected assets and interfaces. Demolition Works – Demolition and clearance of existing structures where required to facilitate delivery of Early Works. Earthworks Trials – A scaled-down embankment constructed to validate ground behaviour, design assumptions, construction methods and specifications before full-scale reservoir embankment delivery. The duration of the Framework is proposed to be an initial 5-year term with a possible extension option. The contracting authority reserves the right, at its sole discretion, to extend the Framework Agreement on up to three occasions with each extension being for a period of 12 months. Accordingly, the maximum duration will be eight years (5 years + 1 year + year + 1 year). We anticipate releasing a Procurement Specific Questionnaire (PSQ) at the beginning of November 2026 with return by the end of November 2026 and launch an ITT January 2027. Anticipated Award Date is May 2027 with Contract Completion quarter 2 of 2032. The estimated contract value is currently anticipated to be between £60 million and £80 million. This estimate is provided for market engagement purposes only and will be confirmed in the tender notice.

Categories (CPV)

Similar open tenders

  • PRO005166 - ORiW - Design and Integration Partner

    Location: North WestBuyer: United Utilities Water Limited

    Open tenderCloses 30 Nov, 202625 daysValue £600.00mSource Find a Tender

    This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing dischar

  • PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works

    Location: West MidlandsBuyer: Derbyshire County Council

    Open tenderCloses 5 Dec, 202630 daysValue £1.44mSource Find a Tender

    For design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).

  • Fusion21 Construction & Refurbishment Framework (2027-31)

    Location: North WestBuyer: Fusion 21 Foundation

    Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a Tender

    Fusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina

  • LW195 QUP IMP Support - Castlevax

    Location: North WestBuyer: Liverpool School of Tropical Medicine

    Open tenderCloses 30 Nov, 202625 daysValue £100.00kSource Find a Tender

    LSTM is seeking to appoint a suitably qualified and authorised supplier to provide Qualified Person (QP) services and associated GMP, regulatory, importation, labelling and clinical trial supply services for the COVAXCHIM002 Phase 2b clinical trial, taking place in the UK, Belgium and Singapore. For more information ab

  • Condition Survey Programme Various Sites

    Location: North WestBuyer: St Helens Council

    Open tenderCloses 26 Nov, 202621 daysValue £100.00kSource Find a Tender

    St Helens Council is seeking to appoint a suitably qualified contractor for the Condition Survey Programme Various Sites For a full specification for this opportunity, please register you interest. Please note that this opportunity is being ran as an open restricted tender, open to the businesses based within the follo

  • Footways Maintenance Survey (Lot 3) (2027)

    Location: South EastBuyer: West Sussex County Council

    Open tenderCloses 16 Nov, 202611 daysValue £60.00kSource Find a Tender

    West Sussex County Council are seeking to and identify suitably qualified and interested organisations to obtain road condition data for the highway network for footways and remote cycleways during 2027.

About Anglian Water Services Ltd

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Find a Tender (Open Government Licence v3.0). Always read the original notice before responding.