Project Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for Infrastructure Delivery - Flood Mitigation Work at IDA Lands National Technology Park, Co. Limerick

IDA Ireland · Ireland

Key facts

Estimated value
€900,000
Closing date
29 Apr 2025
Contract starts
01 Jun 2025
Contract ends
31 May 2028
Procedure
Open procedure
Buyer type
Central government

Description

IDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to examine viable options to minimise the risk of ingress of flood waters to NTP from the Shannon and Mulcair and manage flood water arising from surface water run off within the park during river flood pluvial flooding. A new flood defence is necessary because the existing flood defence berm provides an insufficient level of protection and currently allows for water seepage beneath the berm through extensive granular soils. There is an existing boundary fence associated with a client’s facility to the east of the site And this fence will be relocated further to the south to facilitate the construction of the flood defence. Due to environmental constraints identified on the Mulkear River spawning lamprey it is proposed to remove existing stormwater outfalls from the site along the Mulkear River and create a new stormwater drainage network with attenuation ponds and treatment draining to the River Shannon through the existing outfall. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil, Structural and Design Engineers, Quantity Surveyor, Employer’s Representative, PSDP, Assigned Certifier, Third Party co-ordinator, Ecologist and any relevant specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include if required completion of Stage 1 Planning Permission queries 2 Post Planning Submission and Detailed Design 3 Procurement and Assessment of Works Contractor 4 Construction and 5 Handover. A multi-disciplinary Technical Resource Resident Engineer will be required to be procured by the appointed Design Team and a separate appointment will be made for this.

Categories (CPV)

Similar open tenders

About IDA Ireland

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on TED (Tenders Electronic Daily) (EU open data (Decision 2011/833/EU)). Always read the original notice before responding.