Subsea Cable Tail Installation Equipment & Services

Wave Hub Limited · United Kingdom

Key facts

Estimated value
£1,200,000
Closing date
15 Jan 2016
Contract starts
05 Feb 2016
Contract ends
05 May 2016
Procedure
Open procedure
Buyer type
Other public body

Description

Procurement of equipment to install four no. 33kV rated cable tails from the current dry mate connectors to the 4 developer berths at the Wave Hub offshore facility for the development and testing of wave energy devices, providing a well-defined and monitored site with electrical connection to the onshore UK electricity grid. It is intended to replace the current 11kV rated dry mate connectors with a 33kV rated in-line joint and to terminate the cables with half of a 33kV dry mate connector. Four 300m cable tails, each consisting of a double armoured three-core cable, are laid to the north east as a bundle section over a distance of 160m from the TDU. Workscope to supply equipment to replace the current dry mate connectors with an in-line joints and to terminate the cables with half of a dry mate connector along with testing of cables onshore. Complete supply scopes: 4 x in-line joint 4 x Dry mate connector Onshore cable testing services Cable abrasion protection Supply of Rock Bags

Categories (CPV)

Similar open tenders

About Wave Hub Limited

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.