TRN 970/01/2015 Review of the evidence on the effects of and response to amplitude modulation (AM) from wind turbines, with a view to recommending how excessive AM might be controlled through the use of a planning condition
Department of Energy & Climate Change · United Kingdom
Key facts
- Contract value
- £15,000
- Awarded
- 02 Aug 2015
- Contract starts
- 02 Aug 2015
- Contract ends
- 26 Feb 2016
- Procedure
- Open procedure
- Buyer type
- Central government
Awarded to
| Supplier | Value |
|---|---|
| Parsons Brinckerhoff | £15,000 |
Description
The Department of Energy and Climate Change (âDECCâ) wishes to commission a review of the evidence on the effects of and response to amplitude modulation (AM) from wind turbines, with a view to recommending how excessive AM might be controlled through the use of a planning condition. The aims of the project are:
⢠To review the available evidence on Amplitude Modulation (AM) in relation to wind turbines, including but not limited to the research commissioned and published by RenewableUK in December 2013. ⢠To work closely with the Institute of Acousticsâ AM working group, who are expected to recommend a preferred metric and methodology for quantifying and assessing the level of AM in a sample of wind turbine noise data. ⢠To review the robustness of relevant dose-response relationships, including the one developed by the University of Salford as part of the RenewableUK study, on which the correction (or penalty) for amplitude modulation proposed as part of its template planning condition is based. ⢠To consider how, in a policy context, the level(s) of AM in a sample of noise data should be interpreted, in particular determining at what point it causes a significant adverse impact. ⢠To recommend how excessive AM might be controlled through the use of an appropriate planning condition. ⢠To consider the engineering/cost trade-offs of possible mitigation measures.
The contractor will be expected to apply the following methodology:
Phase 1 ⢠Propose an approach and methodology ⢠Prepare a detailed work plan ⢠Engage with IOAâs AM Working Group and other external stakeholders, including researchers, planning authorities, developers and RUK (and the contractors that carried out work packages for them), to compile a list of relevant research and evidence ⢠Define evidence needs
Phase 2 ⢠Review the outputs from the RUK research, in particular: o the robustness of the study into the subjective response to AM and the conclusions drawn about an appropriate penalty scheme o the merits of the proposed planning condition, in the context of ETSU-R-97 and Circular 11/95 ⢠Obtain and review other relevant evidence ⢠Summarise (for non-technical audience) main findings of review of evidence ⢠Recommend an appropriate penalty scheme (or alternative) for use in a planning condition, compatible with the IOA AM Working Groupâs preferred metric ⢠Prepare a report summarising the main findings and setting out clear recommendations, in a form suitable for publication by DECC. (The report should discuss the limitations of the evidence on which the recommendations are based.) ⢠Present the main findings and recommendations to the IOAâs AM Working Group and, separately, to DECCâs Steering Group for this work.
The contractor will be expected to work closely with the IOAâs AM Working Group throughout the project. They will also be required to attend DECCâs Steering Group meetings as appropriate.
Additional information: Please note: This contract may be withdrawn and not awarded should there be a change in DECC policy following the General Election. ⢠To review the available evidence on Amplitude Modulation (AM) in relation to wind turbines, including but not limited to the research commissioned and published by RenewableUK in December 2013. ⢠To work closely with the Institute of Acousticsâ AM working group, who are expected to recommend a preferred metric and methodology for quantifying and assessing the level of AM in a sample of wind turbine noise data. ⢠To review the robustness of relevant dose-response relationships, including the one developed by the University of Salford as part of the RenewableUK study, on which the correction (or penalty) for amplitude modulation proposed as part of its template planning condition is based. ⢠To consider how, in a policy context, the level(s) of AM in a sample of noise data should be interpreted, in particular determining at what point it causes a significant adverse impact. ⢠To recommend how excessive AM might be controlled through the use of an appropriate planning condition. ⢠To consider the engineering/cost trade-offs of possible mitigation measures.
The contractor will be expected to apply the following methodology:
Phase 1 ⢠Propose an approach and methodology ⢠Prepare a detailed work plan ⢠Engage with IOAâs AM Working Group and other external stakeholders, including researchers, planning authorities, developers and RUK (and the contractors that carried out work packages for them), to compile a list of relevant research and evidence ⢠Define evidence needs
Phase 2 ⢠Review the outputs from the RUK research, in particular: o the robustness of the study into the subjective response to AM and the conclusions drawn about an appropriate penalty scheme o the merits of the proposed planning condition, in the context of ETSU-R-97 and Circular 11/95 ⢠Obtain and review other relevant evidence ⢠Summarise (for non-technical audience) main findings of review of evidence ⢠Recommend an appropriate penalty scheme (or alternative) for use in a planning condition, compatible with the IOA AM Working Groupâs preferred metric ⢠Prepare a report summarising the main findings and setting out clear recommendations, in a form suitable for publication by DECC. (The report should discuss the limitations of the evidence on which the recommendations are based.) ⢠Present the main findings and recommendations to the IOAâs AM Working Group and, separately, to DECCâs Steering Group for this work.
The contractor will be expected to work closely with the IOAâs AM Working Group throughout the project. They will also be required to attend DECCâs Steering Group meetings as appropriate.
Categories (CPV)
- 73000000 Research and development services and related consultancy services
Similar open tenders
Pay and Reward Strategy
Location: LondonBuyer: Office of Rail and Road
Open tenderCloses 3 Dec, 202628 daysValue £55.00kSource Find a TenderThe Office of Rail and Road has committed to carry out a comprehensive review of its Pay and Reward Strategy for all pay grades below the Senior Civil Service (SCS). The aim is to ensure that ORR has a strategy in place that delivers an equitable and consistent approach to pay and reward which is understood and suppor
Research Services for Pensions illustrations: presenting uncertainty and variability
Location: LondonBuyer: THE FINANCIAL REPORTING COUNCIL LIMITED
Open tenderCloses 7 Dec, 202632 daysValue £125.00kSource Find a TenderThe Financial Reporting Council (FRC) regulates auditors, accountants and actuaries and sets the UK's Corporate Governance and Stewardship Codes. As the Competent Authority for audit in the UK, we set auditing and ethical standards and monitor and enforce audit quality. The FRC requires Research Services to examine how
AI Creator Control
Location: WalesBuyer: Intellectual Property Office
Open tenderCloses 28 Nov, 202623 daysValue £80.00kSource Find a TenderThe IPO requires a supplier to provide research to support this review. The intention is that this will be a four-month project including an interim report (shared with policy officials) and final report (prepared for external publication). The Government may wish to communicate initial findings from the interim report
Mapping the Research and Innovation Ecosystem in select North African countries Priorities Actors and Uk Partnership Opportunities in Algeria Egypt Morocco and Tunisia
Location: LondonBuyer: British Council
Open tenderCloses 25 Nov, 202620 daysValue £70.00kSource Find a TenderThe British Council invites proposals to conduct a market intelligence study titled Mapping the Research and Innovation Ecosystem in Selected North African Countries Priorities Actors and Uk Partnership Opportunities covering Algeria Egypt Morocco and Tunisia
Westgate Vision 2040 - Multi-Disciplinary Design Team (MDDT) Consultancy Service
Location: IrelandBuyer: Louth County Council
Open tenderCloses 25 Nov, 202620 daysValue €900.00KSource TEDDelivery of detailed design, tender and management of construction phase to handover for Westgate Vision Public Realm Scheme Character Area 1 and 2
Ireland West SDZ Designated Activity Company DAC is seeking consultancy services to support the development of an Aviation Circular Economy Hub at Ireland West Airport Knock.
Location: IrelandBuyer: Mayo County Council
Open tenderCloses 24 Nov, 202619 daysValue €125.00KSource TEDMCC are publishing this competition on behalf of Ireland West SDZ Designated Activity Company. The brief is to undertake the market validation, technical, commercial and operational planning development work necessary to establish the proposed Hub’s viability. The tenderer shall identify an appropriate operating model