Skip to content
Tenfell
Closed tender
Published 13 Apr 2015

Kedleston Rd, Boiler Replacement and CHP

UNIVERSITY OF DERBY · East Midlands

Key facts

Closing date
01 May 2015
Contract starts
17 May 2015
Contract ends
02 Nov 2015
Procedure
Open procedure
Buyer type
Education

Description

The Services Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and within this specification, employing skilled personnel and specialist contractors as necessary to achieve the standards described. The works include the supply, installation, testing and commissioning of new replacement boilers, builders work, CHP, chiller, BMS controls, back up HWS generation, new replacement pumps, new pipework and associated mechanical and electrical services within the East Tower and North Tower plantrooms at the University of Derby, Kedleston Road Campus in Derby. The works shall also include the isolation, de-commissioning, strip-out and removal from site of the existing boiler plant, chiller, pumps, pipework control wiring and associated installations made redundant by the replacement boiler/chp/chiller installation.

The Mechanical Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and within this Specification, employing skilled personnel and specialist contractors as necessary to achieve the standards described. The works are to be carried out two phases, Phase 1 to provide direct gas fired HWS generation to cover the summer period and when commissioned and operational to remove the existing boiler plant, controls, pipework pumps and Install new boiler plant pipework, pumps, controls, pipework and chillers before 1st September 2015. Phase 2 to de commission the R22 chiller and remove, install the new CHP, complete the chilled water system and commission and then complete and commission the CHP by the 2nd November 2015.

Contract is to be MF/1

All of works are to be carried out to the agreed programme and completed by 02/11/15. The project shall be phased to ensure minimum disruption is caused on site. The contract intended programme requirements are appended to this section of the Specification. Date for Commencement of the works (to allow plant lead-in periods): 11/05/15 Date for start on site: 11/05/15 Date for Completion Phase 1: 31/08/15 Date for start of Phase 2: 14/09/15 Date for Completion Phase 2: 02/11/15 The Services Contractor will be required to prepare a master programme and progress chart to clearly indicate how the work is to be carried out to completion within the period of the Contract.

To arrange a site visit please contact Ian Cain on 01332 591104 or [email protected] or Martin Simms on 01332 591107 or [email protected]

Additional information: Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/derby/aspx/

Categories (CPV)

Similar open tenders

About UNIVERSITY OF DERBY

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.