ESPH GP Buckshole Reservoir Safety Works (ESPH361) - AWARD
Hastings Borough Council · South East
Key facts
- Contract value
- £875,423
- Awarded
- 14 Jul 2021
- Contract starts
- 18 Jul 2021
- Contract ends
- 29 Apr 2022
- Procedure
- Other -
- Buyer type
- Local government
Awarded to
| Supplier | Value |
|---|---|
| Jackson Civil Engineering Group Limited | £875,423 |
Description
Hastings Borough Council sought a suitably qualified and experienced Contractor to carry out safety works for Buckshole reservoir.
Buckshole Reservoir is located on the northern side of Alexandra Park in the heart of Hastings, East Sussex. The reservoir was built in 1852 to serve as a water supply for Hastings. However, it is now only used for fishing and provides a public amenity as part of the important Grade 2 listed Alexandra Park. The reservoir is currently owned and operated by the Council.
A report on the reservoir was issued in 2017 following a statutory inspection under Section 10 of the Reservoirs Act 1975. The report included a number of recommendations made in the interests of safety. These recommendations are mandatory and are made with the objective of bringing about improvements to the dam and the associated overflow arrangements that will reduce the risk of dam failure, and thus reduce the risk to life and property downstream. In general terms the recommendations require works to be carried out such that the dam and overflow arrangements satisfy current industry guidance.
The scope of this project is to carry out the following reservoir safety works: o Retain the upper 4m wide 1.8m high section of existing spillway channel, raise the sidewalls and construct a new roof slab across the first 10m length of retained channel to support new landscaping. o Immediately downstream, retain a 7m long section of the existing channel and raise the sidewalls with the left side wall raising (looking downstream) also incorporating a flow deflector. o Demolish the remainder of the existing channel all the way to the downstream toe of the embankment and construct an in-situ reinforced concrete U shaped channel nominally 2m high with a clear opening of 4m. o At the central embankment toe, construct a stilling basin structure, which will comprise a flat U trough channel section with baffle blocks and an end wall. o Construct a roof slab to cover 5m of the stilling basin at the downstream end to support new landscaping. o Construct a further 5m length of new channel downstream of the stilling basin, with sloping wingwalls to tie into existing channel sidewalls. o Install a new siphon draw-off pipeline, including all associated pipe sections and specials, valves, pipe supports and valve chambers. o The upstream end of the pipeline will be installed on the bed of the reservoir. o The pipeline will then pass through the existing spillway structure, by coring through the spillway weir wall and fixing to the left sidewall, internally within the existing overflow structure and the to the left side wall of the spillway channel. o The downstream end of the pipeline terminates in a valve and discharge chamber adjacent to the main spillway channel, including an overflow notch into the spillway channel to discharge flows from the pipeline. o Landscaping works including new planting and...
Categories (CPV)
Similar open tenders
Door Entry Phased Replacement Programme 2026-27
Location: LondonBuyer: London Borough of Hillingdon
Open tenderCloses 2 Dec, 202627 daysValue £200.00kSource Find a TenderThe London Borough of Hillingdon (LBH) intends to install/upgrade the Door Entry/Access Control to 40 low and medium rise blocks. This work will be based on a planned program. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete and fully functional audio door
Crane Provision Framework
Location: South EastBuyer: KBS Maritime Ltd
Open tenderCloses 3 Dec, 202628 daysValue £4.00mSource Find a TenderKBS Maritime is seeking to establish a multi-supplier Framework for complete third-party crane services in support of Alongside Services operations. The Framework will supplement, not replace, KBS internal Heavy Lift capability and will provide planned surge, operational resilience, out-of-hours support, concurrent-lif
lumbing PPM and reactive repairs for Hertfordshire Police
Location: East of EnglandBuyer: The Police and Crime Commissioner for Hertfordshire
Open tenderCloses 3 Dec, 202628 daysValue £371.50kSource Find a Tenderlumbing PPM and reactive repairs for Hertfordshire Constabulary
Allotment Track Repairs
Location: South EastBuyer: Gosport Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £65.00kSource Find a TenderGBC is inviting quotations for the supply, delivery and installation of track repairs at Brockhurst Allotment, Manor Way Allotment, and Middlecroft Allotment.
UKREiiF Stand Design and Build
Location: ScotlandBuyer: Glasgow City Council
Open tenderCloses 9 Dec, 202634 daysValue £150.00kSource Public Contracts ScotlandGlasgow City Council is seeking to appoint a company to design, build and deliver an exhibition stand on behalf of Invest Glasgow at The UK’s Real Estate Investment and Infrastructure Forum (UKREiiF) for the next three years. In 2027, the event will take place in the Royal Armouries Museum in Leeds, from 18-20th May. F
Electrical Rewire and associated work at Duncan Mills Memorial Slipway in Balloch
Location: ScotlandBuyer: Loch Lomond & The Trossachs National Park Authority
Open tenderCloses 7 Dec, 202632 daysValue £100.00kSource Public Contracts ScotlandElectrical Rewire and associated work at Duncan Mills Memorial Slipway in Balloch