Awarded contract
Published 02 Jun 2022

Floating Offshore Wind - Advanced Manufacturing of Substructure Components ORE/22/023

Offshore Renewable Energy Catapult · United Kingdom

Key facts

Contract value
£184,950
Awarded
10 May 2022
Contract starts
15 May 2022
Contract ends
17 Mar 2024
Procedure
Open procedure
Buyer type
Utilities & transport

Awarded to

SupplierValue
BVG Associates£184,950

Description

· Assess the state of the art review of FOW and fixed bottom wind substructure designs / typologies to identify common components, materials, manufacturing and assembly methodologies (including primary component fabrication, secondary component fabrication, component assembly, painting / blasting, final fit out (to create complete substructure); · Assess the state of the art of major (representative) international manufacturing facilities with capability to deliver these major components; · Assess the state of the art of "advanced" methods of manufacturing, assembling, blasting and painting such components (either in use at commercial scale or sufficiently well developed for commercial application in the near term and with either evolutionary or disruptive impacts) in the context of these being applied in a serial manufacturing process; · Analyse the potential to utilise advanced manufacturing methods (including design for manufacture methodologies) to reduce the cost of fixed and floating wind substructures, including techno-economic study of impact on LCOE; · Analyse the potential blockers to adopting advanced manufacturing methods for offshore wind.

Tender documents available free of charge at https://procontract.due-north.com

Categories (CPV)

Similar open tenders

About Offshore Renewable Energy Catapult

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.