A303 Amesbury to Berwick Down (Stonehenge)
Highways England · United Kingdom
Key facts
- Awarded
- 07 Sep 2022
- Contract starts
- 07 Sep 2022
- Contract ends
- 31 Dec 2031
- Procedure
- Competitive dialogue (above threshold)
- Buyer type
- Central government
Awarded to 3 suppliers
| Supplier | Value |
|---|---|
| BeMo Tunnelling UK Ltd | — |
| FCC Construcción, S.A. | — |
| Webuild S.p.A. | — |
Description
The planning application for the A303 Stonehenge is still pending redetermination by the Secretary of State for Transport, following the quashing of the decision to grant the Development Consent Order (DCO). This contract will only become live once the Secretary of State has concluded the planning process and only if this process results in a DCO being granted.
The requirements of the scheme that will be the responsibility of the successful applicant are principally captured in the following areas: 1. Design and construction of the new works; The scheme's new works includes the design and construction of the civil, mechanical, electrical and plumbing (MEP), technology and environmental components, key features of the new works are summarised below: - Tunnel: A twin-bore tunnel, approximately 2 miles (3.3 kilometers) long beneath the Stonehenge World Heritage Site, including tunnel portals and approach structures, tunnel service buildings and plant rooms, tunnel control system and mechanical, electrical and plumbing systems - Tunnel boring machine - design, manufacture, testing, shipping and on-site assembly - Carriageway works - Bridge works to form a viaduct over the River Till, an under bridge for the B3083, a flyover at the A345 Countess Roundabout, and 4 green bridges (Parsonage Down accommodation bridge, Winterbourne Stoke accommodation bridge, A360 Longbarrow Junction & green bridge No. 4) - Carriageway and tunnel technology - Landscaping and habitat creation - Extension of Parsonage Down National Nature Reserve - Protected species mitigation measures - Ensure rights of way and private means of access - Mainline earthworks - Utilities works 2. Refurbishment, replacement and modification of existing assets; There are works required on existing assets under the current ownership of both National Highways and Wiltshire Council. Continued engagement and consultation will be required with both parties throughout the design and construction phases for these elements including: - Existing A303 de-trunking works - Demolition works and site clearance works - Modification works to existing structures 3. Maintenance and operation during construction Maintenance and operation of the existing A303 within the site boundary will be required for the duration of the construction works. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities. 4. Post construction maintenance period There is an extended maintenance period (minimum of 5 years, maximum of 7 years) after construction to 'prove' the tunnel performs as intended. Maintenance is included as part of this period and the Contractor will be responsible for all elements of the infrastructure associated with the tunnel and its approaches. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities and tunnel operations.
Categories (CPV)
- 45221241 Road tunnel construction work
Similar open tenders
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202643 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved
Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, Farnham
Location: South EastBuyer: Waverley Borough Council
Open tenderCloses 30 Nov, 202625 daysValue £78.00kSource Find a TenderGuildford Borough Council is seeking to appoint a suitably qualified and experienced contractor to design, supply, install, test and commission a roof-mounted Solar Photovoltaic (PV) system at The Enterprise Centre, Farnham. The project forms part of the Council's commitment to reducing carbon emissions, improving ener
GH2011 Kitchen and Bathrooms Refurbishment
Location: United KingdomBuyer: Golding Homes
Open tenderCloses 20 Nov, 202615 daysValue £21.00mSource Find a TenderThis is a project for the refurbishment of kitchens and bathrooms to properties owned and managed by The Client for 3 years with the option to extend by further 2 years.
Framework Agreement for the Application of Mould Treatment
Location: WalesBuyer: City & County of Swansea
Open tenderCloses 4 Dec, 202629 daysValue £400.00kSource Find a TenderThe City and County of Swansea (the Employer) requires competent and experienced Contractors to deliver mould treatment works across its housing stock. The Framework Agreement will support the effective management of damp and mould in both occupied and void domestic properties, including communal areas, throughout Swa