Skip to content
Tenfell
Closed tender
Published 11 Jun 2015

PP15061 Eastfield Primary School 2015

City of Wolverhampton Council · West Midlands

Key facts

Estimated value
£800,000
Closing date
08 Jul 2015
Contract starts
17 Sep 2015
Contract ends
18 Dec 2015
Buyer type
Local government

Description

THE WORKS The Works comprise of the extension, alteration and refurbishment of a Primary School as follows: AREA 1 - New Reception Classes. Alterations internally to part of the existing corridor, two existing classrooms and linking access space to form new reception classrooms and quiet study area. Works consist of forming new glazed screens to classrooms/quiet area; opening out and forming new doorway in glazed screens between corridor and classrooms. To form ramped timber floor area in corridor to give level thresholds into classrooms. Reversal of corridor door to allow for ramped access. Full decoration to new reception classes and quiet area and affected area of corridor. No mechanical work and limited electrical work. AREA 2 - New Resource Area and ICT Suite. Alterations internally to rooms 106,115,109 and 113 to form new resources area and new ICT suite, including removal, strip out of redundant fixtures and fittings. Works to include removal of wall between 106 and 115 and building in of new steel beam to form one space. In area 113 form a raised timber floor to give strep free access across thresholds to area 109 and partly sloping floor to give level access to area 114. Remove existing floor finishes, lay levelling screed as necessary and lay new carpet to areas 106, 115, 109 and 113. Carry out alterations to mechanical and electrical services as specified including removal of all redudnant materials and ICT ducting. Carry out full decoration to the four areas. AREA 3 - Two New Classrooms, Corridor Extension and New Storeroom. Construction of new single storey extension against existing gable end of the teaching wing; consisting of two classrooms, corridor extension and internal storeroom. The new construction consists of a concrete raft foundation and ground stabilisation, load bearing internal and external masonry walls, timber roof (partly trussed rafters) with interlocking slates and aluminium windows and doors. Internally, timber doors and frames, plastered walls and ceilings (except corridor) and carpeting to classrooms on screed on insulation. The corridor and storeroom floors are vinyl tiles again on screed and insulation. Form access from existing corridor with new openings in existing external wall and remove partition wall forming existing store room and making good. Fill step area to form direct access from new classroom to existing side extension. The new works to include full electrical and mechanical installation and attendance on IT installation by others. AREA 4 - External Works To include removal of picket fence to play area adjacent to Area A. Forming drainage connection from new sinks and down pipes. Grading and making good macadam surfacing arou..(view full details to see more)

Additional information: This requirement is being tendered through Wolverhampton City Council's e-procurement portal which can be located at the following address: www.wolverhamptontenders.com .Registration to the site is free and should take no longer than 5 minutes to complete. Once registered the full Invitation to Tender can be accessed and downloaded. THE PROJECT Name: Eastfield Primary School - Primary Expansion Programme . Nature: Extensions and Alterations to existing Primary School . Location: Colliery Road, Wolverhampton, WV1 2QY.

Categories (CPV)

Similar open tenders

About City of Wolverhampton Council

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.