Design and construction of a wheeled sports facility
Key facts
- Estimated value
- £450,000
- Closing date
- 19 Jan 2024
- Contract starts
- 31 Aug 2024
- Contract ends
- 28 Mar 2025
- Procedure
- Open procedure (below threshold)
- Buyer type
- Local government
Description
Design & Construction of a new Wheeled Sports Facility
Bude-Stratton Town Council are seeking a suitably experienced and qualified design and build contractor to undertake the design, renovation, enhancement and build of a new wheeled sports facility named Cable Park, near Crooklets beach in Bude, Cornwall.
Bude deserves a modern wheeled sports facility that has space and interest for a wide range of ages, skills and types of wheeled sports. It shall be a destination venue fully accessible, visitor friendly, safe and with green credentials.
The wheeled sports project looks to expand the current site; we are proposing that the current park is enhanced and improved with a focus on beginners and other wheeled sports users and that a new site further inland constructed from new, for more advanced users.
Between the new and existing site there is a green zone with a buried transatlantic cable which must not be disturbed. This is a no-dig zone 3m wide either side of the buried cable. There will be a need for transition routes between the existing and the new sites but that do not compromise the no-dig policy.
The ecology of the site isn't outstanding, but it is in a highly visible location and there is a strong local appreciation of the Downs landscape. It is within 2km buffer of Area of Outstanding Natural Beauty (AONB), within SSSI Impact Risk Zones and a Special Area of Conservation (SAC) is located approximately 115m to the West of the site.
Tenderers are requested to submit their Concept Design for the Project at tender and will be assessed on their response to the Cable Park vision, price, relevant experience, method and programme. Contractors whose bids are of interest will be provided the opportunity to present these proposals to a panel including the User Group. The successful contractor will be responsible for initially gaining planning approvals for the project, RIBA stage 3. If planning is successful along with funding for the project being gained by the employer, the contractor will then be responsible for RIBA works stages 4-6.
We anticipate site works starting preferably by September 2024, with completion no later than Easter 2025. Given the location of the site, consideration should be allowed within the programme for adverse weather.
The project is supported by external funding grants and Bude-Stratton Town Council.
Please email [email protected] expressing an interest and you will be provided with the tender pack to complete and return.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Construction of New Fire Training Building at the Joint Training Centre
Location: East MidlandsBuyer: The Police and Crime Commissioner for Derbyshire
Open tenderCloses 17 Dec, 202642 daysValue £3.00mSource Find a TenderDerbyshire Police Fire Partnership LLP is seeking to award a Contract for the provision of the Construction of a New Fire Training Building at the Joint Training Centre, as detailed in the Invitation to Tender Statement of Requirements.
Courts to Canopy – a Nature Restoration Project
Location: WalesBuyer: Neath Port Talbot County Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £95.00kSource Find a Tender1.1 Introduction Neath Port Talbot County Borough Council (the “Council”) is seeking to appoint the services of a contractor, to enable the transformation of a local Tennis Courts in the area of King George V Pontardawe. The old tennis courts will become a space for people and nature introducing a meadow, tree Planting
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 5 Dec, 202630 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
Frimley Lodge Car Park Project
Location: South EastBuyer: Surrey Heath Borough Council
Open tenderCloses 8 Dec, 202633 daysValue £1.21mSource Find a TenderFrimley Lodge Car Park Project - reconstruction of the Main Car Park and Main Access Road, resurfacing of Main Entrance Road; includes new drainage, signage, lighting and power for 2 no. electric vehicle charging points (EVCP) and the infrastructure ducting only for the possible future expansion of EVCPs and CCTV provi
CS6096 School Decarbonisation - Bonner Mile End Main Works Contractor
Location: LondonBuyer: London Borough of Tower Hamlets
Open tenderCloses 30 Nov, 202625 daysValue £1.36mSource Find a TenderThis procurement aims to appoint a main works contractor via an Open Procedure tender to deliver decarbonisation and comfort improvement works at the Grade II listed Primary School, Bonner Mile End, located in Mile End, in the London Borough of Tower Hamlets. The school currently faces significant thermal discomfort -