HS2 Main Works S1 & S2 - WP148.3_Noise Barriers (Precast installation & FRC torsion beams)
Key facts
- Estimated value
- £5,000,000
- Closing date
- 08 Apr 2022
- Contract starts
- 01 Jul 2023
- Contract ends
- 30 Aug 2024
- Buyer type
- Other public body
Description
The scope of the subcontract works for this package is the installation of the free issue precast reinforced-concrete noise barriers, which are to be manufactured and supplied by the precast concrete manufacturer engaged by SCS JV, as well as the construction of the Formwork Reinforced Concrete (FRC) torsion beams, including the design, installation and removal of the required temporary works (e.g. Kelly blocks, props, pedestals, pancake jacks, etc.).
This is required for the proposed noise barrier structure to be installed as part of the works it is undertaking on behalf of HS2 for the S1 and S2 sectors of the main civil engineering tranche of HS2 Phase One. The proposed noise barrier structure is c.1.5km in length and is to be installed either side of the HS2 trace along the West Ruislip Retained Embankment (including the Breakspear Road South and River Pinn Underbridges) and the Gatemead Embankment.
It is SCS JV's preference to engage a specialist precast concrete installer to install the precast reinforced-concrete noise barriers into position, including the design, installation and removal of the required temporary works (e.g. Kelly blocks, props, pedestals, pancake jacks, etc.), whereby it is understood that the FRC works relating to the construction of the torsion beams may either be delivered directly by the specialist precast concrete installer or subsubcontracted to an FRC subsubcontractor.
To assist you in determining whether or not this opportunity is of interest to your company, please find attached the following:
- Noise Barrier - Construction Sequence - 20-7-21 (The subcontract works for this package will comprises Stages 6-9 (both inclusive)). - Ruislip Noise Barriers Architectural Drawing Sections, axonometrics and visualisation (1MC04-SCJ_SDH-AR-DPH-SS05_SL07-869000 rev P02). - Specification and SCEW Appendices - Noise Barriers S2 (1MC04-SCJ_SDH-DS-SPE-SS05_SL07-000008 rev C02.2). - (General Plan) Ruislip Noise Barriers, Engineering Structural Drawing, General Plan, Ruislip Noise Barriers (1MC04-SCJ_SDH-ST-DSO-SS05_SL07-865001 rev P03). - (Typical example of setting out drawing for south side of the embankment, including the RPU) Ruislip Noise Barriers, Engineering Structural Drawing, General Arrangement, Setting Out, Noise Barriers, Torsion Beams, Piles 3 (1MC04-SCJ_SDH-ST-DGA-SS05_SL07-860103 rev P02). - (Typical example of setting out drawing for north side of the embankment, including the RPU) Ruislip Noise Barriers, Engineering Structural Drawing, General Arrangement, Setting Out, Noise Barriers, Torsion Beams, Piles 8 (1MC04-SCJ_SDH-ST-DGA-SS05_SL07-860108 rev P02).
PLEASE REFRAIN FROM RESPONDING TO THIS OPPORTUNITY UNLESS YOU HAVE READ IT IN FULL AND HAVE THE CAPABILITIES / EXPERTISE TO UNDERTAKE WHAT IS REQUIRED, TAKING INTO CONSIDERATION THE COMPLEXITY. Following responses to this opportunity, the supply chain will be shortlisted accordingly. Those that are successful will be invited to prequalify in order to receive a tender enquiry for this package. Prequalification will consist of 'business assurance', which will focus on the supply chain's capability, competence and capacity to work with SCS JV, and (potentially) technical assurance, which provides an opportunity to assess the supply chain's ability to carry out the subcontract works for the package in question. It is likely that this has been classified as a 'medium-risk' package (to be confirmed), whereby the 'business assurance' element of prequalification may be satisfied if the supply chain partner holds one of the Common Assessment Standard (CAS) accreditations, namely:
- Achilles Building Confidence (with Desktop Audit) - Achilles Building Confidence (with Site Audit) may be required if the package is classified as high risk, - Constructionline Gold - Constructionline Platinum may be required if the package is classified as high risk, or - CHAS Elite.
Further to a tender process, final selection will be based upon a balanced-scorecard evaluation. The criteria of this evaluation will consider commercial, technical and qualitative (e.g. health & safety, quality, environment & sustainability, etc.) evidence provided by the tenderers as part of their respective tender bids. SCS JV is an unincorporated joint venture between Skanska Construction UK Limited ("Skanska"), Costain Limited ("Costain") and STRABAG AG ("STRABAG") working on behalf of HS2 to deliver the main civil engineering works for the S1 and S2 sectors of HS2 Phase One. The Early Contractor Involvement (ECI) stage of the contract, where SCS JV was developing a scheme design, programme and target cost to deliver the detailed design and construction phase of the project, is now complete, whereby a Notice to Proceed to Stage Two (detailed design and construction) was issued on 15th April 2020. Not only have the individual companies delivered high-speed rail, major infrastructure and some of the most iconic structures internationally, SCS JV also has a proven record of working together. Skanska and Costain have a long history of successfully delivering civil engineering projects together in the UK, dating back 30 years. In joint venture they have delivered many major infrastructure projects, including the M25 in the 1980s, High Speed 1 in the early 2000s and the current Crossrail endeavour, shortly coming to completion under the streets of London. STRABAG and Skanska have worked together for over 15 years on European projects in Switzerland, Slovakia and Norway. As a joint venture, we are bringing together our collective strength to deliver world-class engineering, contributing to the long-term economic growth of local and international markets. This is perfectly encapsulated in our mission; to draw everyone together to create a strong foundation from which to launch a transformative legacy. Key points of contact, quality assurance and site management will be required. Site staff will also need to have the full CSCS and HS2/SCS JV on-boarding requirements.
Additional information: Key points of contact, quality assurance and site management will be required. Site staff will also need to have the full CSCS and HS2/SCS JV on-boarding requirements.
Categories (CPV)
Similar open tenders
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
Supply of Cabins to a holiday rental business in County Carlow
Location: IrelandBuyer: Bilboa Hills Ltd
Open tenderCloses 3 Dec, 202628 daysValue €250.00KSource TEDSupply of 4 Cabins to a glamping enterprise in County Carlow
Donegal County Council - Supply and Delivery of Workshop Tools and Miscellaneous Items
Location: IrelandBuyer: Donegal County Council
Open tenderCloses 2 Dec, 202627 daysValue €60.00KSource TEDSupply and Delivery of Workshop Tools and Miscellaneous Items such as socket sets, wheel alignment gauges, impact wrenches, angle grinders, welding equipment, inspection lamps, wheel removal trolleys, starter packs, trolley jacks and heat torches etc.
Tender 23/2026 - SUPPLY AND DELIVERY OF WORKSHOP TOOLBOXES COMPLETE WITH TOOLS
Location: Northern IrelandBuyer: Newry, Mourne and Down District Council (NMD)
Open tenderCloses 2 Dec, 202627 daysSource Find a TenderNewry, Mourne and Down District Council invite suppliers to tender for the provision of a total of 10 toolboxes complete with tools. This is to equip the workshop personnel with the appropriate tooling to maintain Council vehicles, plant, and equipment to a high standard in line with industry guidelines and statutory r
BBV Sublot 4 - HSST1020 - SALTLEY VIADUCT GABION WALL
Buyer: Balfour Beatty VINCI JV HS2
Open tenderCloses 13 Nov, 20268 daysValue £1.00mSource Contracts FinderOpportunity Summary - Gabion Retaining Wall Works We are seeking experienced suppliers and subcontractors to provide the supply, delivery and installation of a gabion retaining wall system as part of a civil engineering project. Scope of Requirements The successful supplier shall be responsible for: Supply
Supply of EURO Heavyweight and Lightweight Pallets for West Midlands Fire and Rescue Authority 2026 - 2030
Location: United KingdomBuyer: West Midlands Fire and Rescue Authority
Open tenderCloses 4 Dec, 202629 daysValue £250.00kSource Find a TenderWest Midlands Fire and Rescue Authority (the Authority) is seeking to award a Contract for the provision of Euro Heavyweight and Lightweight pallets.