Skip to content
Tenfell
Closed tender
Published 24 Aug 2015

London Bridge Tracks - Surveying and testing

Corporation Of London

Key facts

Estimated value
£140,000
Closing date
18 Sep 2015
Contract starts
03 Oct 2015
Contract ends
08 Nov 2015
Procedure
Not applicable
Buyer type
Other public body

Description

The current London Bridge was designed by Mott, Hay and Anderson. The senior engineer was Alan Simpson, the superstructure was designed by a team led by Michael Leeming, and foundations by a team led by Keith Ponting. The bridge was constructed by contractors John Mowlem and Company from 1967 to 1972, and opened by Queen Elizabeth II on 17 March 1973. It comprises three spans of pre-stressed concrete box girders, at a total of 928 feet (283 m) long. On the upstream and downstream sides of the bridge a track has been provided, below the parapet, to serve the under bridge lighting. The track installation comprises an aluminium “I” beam secured to the underside of the bridge parapet. At the north and south ends of the bridge the track continues into the vaults at the ends of the bridge allowing for access to the track for rigging and derigging a cradle. The fixings for the track comprise two different arrangements alternately spaced along the length of the “I” beam. Existing Installation - From investigation and review of the available drawings held on file. Inspection Regime to reinstate track - There are 110 fixings on each side of the bridge (±5), with 220 fixings in total.

Additional information: You must be registered with Capital eSourcing to register your interest in this procurement.

Categories (CPV)

Similar open tenders

About Corporation Of London

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.