Civils and Substructures
Key facts
- Contract value
- £1,000,000
- Awarded
- 07 Feb 2022
- Contract starts
- 06 Dec 2021
- Contract ends
- 31 Dec 2023
- Procedure
- Call-off from a framework agreement (framework)
- Buyer type
- Other public body
Awarded to 2 suppliers
| Supplier | Value |
|---|---|
| BCM Construction Ltd | — |
| DYER AND BUTLER | — |
Description
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North.
Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - S1 and S2 tunnels.
S1 includes two 9 km twin bored tunnels between the new HS2 stations, Euston and Old Oak Common.
S2 continues from Old Oak Common with 15 km of twin bored tunnels to West Ruislip where there is approximately 5 km of open route before transitioning into C1 lot (managed by Others).
SCS's scope will include the full design of all Main Civil Works for the Lots S1 and S2 of HS2.
The Project is split down into three areas, Area East (Euston), Area Central (Old Oak Common) and Area West (West Ruislip).
This opportunity currently relates to works that will occur in Area West, which extends from West Ruislip to Old Oak Common, although there may be the possibility to extend the scope to cover Area Central and Area East at a later date once requirements have ascertained.
Buildings, bridges and other assets along the route of the tunnels need to be prepared for the tunnel boring machines (TBMs) to be driven through underground and remediated/repaired afterwards in the event of damage as a result of movement and the like.
The specific scope for this opportunity is:
The provision of all management, supervision, labour, plant, materials, equipment and consumables (including fuels) necessary to carry out and complete the design, supply, delivery, installation, maintenance, testing and commissioning of the Building work consisting of:
General Items:
⢠Assessment and design of solutions for permanent works as may be required including associated drawings, calculations and P.I. insurance. ⢠Design and provision of any necessary temporary works required including the associated drawings, calculations and P.I. insurance. ⢠All necessary access provisions and equipment. ⢠Coordination and integration with other trades and subcontractors to properly complete the works. ⢠Necessary expertise, experience, assurances and approvals relating to working in Network Rail, London Underground and Highways environments. ⢠Capability for the fabrication/manufacture of works off-site. ⢠Assistance and support in the preparation for, and acquisition of, any required licenses, consents, approvals and permissions. ⢠BIM capability is preferable although not critical.
Civils and Substructures:
⢠Underpinning, propping/bracing/pre-remediation of existing cracking/structural modifications (rotation provision) etc, service preparation. ⢠Removal of propping/bracing. ⢠Brickwork reinstatement/ making good and repointing of joints. ⢠Concrete slab works to include removal of defected/ cracked sections and reinstatement and or making good, including crack inducers as necessary. ⢠Excavating, including hand digging, as necessary. ⢠Localised drainage and ducting repairs. ⢠Joint/mastic sealing.
When selecting a supplier SCS look for alignment of values, behaviours and cultures, between ourselves and our supply chain. SCS and HS2 have aligned their values to the following: * Safety * Integrity * Leadership * Respect
Please refer to HS2 supplier guide. ( https://www.gov.uk/government/publications/hs2-supplier-guide)
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include: * Making HS2 affordable * Delivering on promises * We build with people in mind * Delivering more than a railway * Achieving more together * Creative and challenging
Successfully shortlisted supplier's will be those with verifiable experience, the appropriate capability and resources to deliver the scope of works. During this stage supplier's may then be invited to the project to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
Shortlisted suppliers will be sent a Prequalification Questionnaire (PQQ) request. Suppliers successfully selected through the prequalification will be invited to provide a formal competitive tender for the services.
The Invitation to Tender (ITT) and final selection will be based upon a balanced scorecard, requiring suppliers to demonstrate their ability to work with the projects values and behaviours in mind, whilst proving their capabilities and competence, through qualitive and quantative evidence. We are an unincorporated joint venture between Skanska, Costain and Strabag working on HS2 main works civil engineering contract for Section 1 and Section 2 of the planned HS2 route. Not only have the individual companies delivered high speed rail, major infrastructure and some of the most iconic structures internationally, the joint venture also has a proven record of working together. Skanska and Costain have a long history of successfully delivering civil engineering projects together in the UK, dating back 30 years. In joint venture they have delivered many major infrastructure projects, including the M25 in the 1980s, High Speed 1 in the early 2000s and the current Crossrail endeavor coming to completion under the streets of London. STRABAG and Skanska have worked together for over 15 years on European projects in Switzerland, Slovakia and Norway. As a joint venture, we are bringing together our collective strength to deliver world-class engineering, contributing to the long term economic growth of local and international markets. This is perfectly encapsulated in our mission; to draw everyone together to create a strong foundation from which to launch a transformative legacy.
Categories (CPV)
Similar open tenders
Refurbishment of Seven Public Conveniences for West Oxfordshire District Council
Location: South EastBuyer: West Oxfordshire District Council
Open tenderCloses 25 Nov, 202621 daysValue £200.00kSource Find a TenderWest Oxfordshire District Council (the Authority) aims to significantly improve the facilities it retains to provide good quality, user-friendly and accessible public conveniences. This is a Design and Build contract, utilising the JCT Minor Works Building Contract with Contractor’s Design 2024, that covers three diff
Older People Out of Area Project - Hawthorne Court
Location: Yorkshire and the HumberBuyer: HUMBER TEACHING NHS FOUNDATION TRUST
Open tenderCloses 27 Dec, 202653 daysSource Find a TenderOlder People Out of Area Project- Hawthorne Court Beverley. Works comprise the internal refurbishment and alterations to form care centre to include the creation of administrative and pastoral rooms, living arrangements and associated M&E upgrades
ENQ1406 - LED Screens, Staging, PA Equipment and Lighting Equipment for Derby LIVE Events
Location: East MidlandsBuyer: Derby City Council
Open tenderCloses 11 Nov, 20267 daysValue £95.00kSource Find a TenderThis quotation is for the supply, installation and de-rig of staging, LED screens, PA and Lighting equipment for Derby LIVE Events. **Please note this procurement has been reserved to suppliers with substantive business operations within the administrative boundary of Derby City Council. The Council is committed to sup
PRN26144 Antrim Area Land, Design and Build
Location: United KingdomBuyer: Choice Housing
Open tenderCloses 4 Dec, 202630 daysValue £9.00mSource Find a TenderChoice Housing seeks to appoint Developer(s) to provide Competitive Land, Design and Build works opportunities in the Antrim area to deliver social housing projects as part of the Social Housing Development Programme (SHDP). This will include the supply of land and design and construction of properties to meet the Depa
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 4 Dec, 202630 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
Procurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base
Location: East of EnglandBuyer: Thurrock Council
Open tenderCloses 30 Nov, 202626 daysValue £600.00kSource Find a TenderProcurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base. The works comprise two elements: the construction of a new single-storey extension of approximately 33m² to provide a secure entrance foyer, office, accessible WC, meeting room and circulation space; and the inte