Bridges Backlog Maintenance - Package 1 - 2016/17

Swindon Borough Council · South West

Key facts

Estimated value
£125,000
Closing date
01 Sep 2016
Contract starts
15 Sep 2016
Contract ends
25 Nov 2016
Procedure
Open procedure
Buyer type
Local government

Description

Bridges Backlog Maintenance – Package 1 - 2016-17

Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the provision of the following work items:

Project Description

The works associated with Bridges Backlog Maintenance – Package 1 will include the following:-

i) Establishment and maintenance of site compound(s). ii) Establishment and maintenance of subway closures and footbridge closures including pedestrian diversion signage. iii) Establishment and maintenance of signal controlled lane closure. iv) Temporary works appropriate to the works. v) Vegetation clearance. vi) Demolition of small bridge incorporating steel beams, transverse timber sleepers and concrete deck slab. vii) Demolition of a small corrugated steel (Armco) culvert. viii) Supply and install 2 x 1050mm diameter pipes in concrete surround. ix) Construct brick headwalls with mass concrete backing. x) TORC cleaning and/or grit blasting of wing walls and edge beams. xi) Painting of concrete surfaces, e.g. subway walls and soffits. xii) Preperation and painting of metal parapets. xiii) Localised parapet repairs, e.g. welding and grouting. xiv) Mastic sealant to joints. xv) Excavation and reinstatement of bitmac footpaths, depth 90mm. xvi) Overlay bitmac footpaths, depth 30mm. xvii) Concrete repairs to edge beams and ballast walls. xviii) Rebuilding of masonry parapet including reinforced concrete coping. xix) Masonry repairs to small stone arch brick. xx) Removal of a timber bridge deck and replacement with anti-slip GRP decking.

Contract Period

The contract will be initially for a period of 2 1/2 months commencing 16th September 2016.

The relevant tender documents are included within this project webpage as attachments.

Tender Responses are required to be submitted no later than 1st September 2016, 14.00GMT by hardcopy to Swindon Borough Council only (refer to the Invitation to Tender document)

If you require any clarifications on the tender documents please submit these in writing via e-mail, including the project name clearly in the e-mail title, to Tomasz Wysocki at [email protected] between 29th July to 19th August 2016, 12.00 GMT.

The Council’s responses to these clarification questions will be uploaded as attachments on the project webpage attachments section. Therefore it is the Contractor’s responsibility to check the site regularly for updates to clarifications, as you will not be advised when updates have been made.

In the event of difficulties downloading tender documents, please refer to the named contacts Tomasz Wysocki at [email protected].

Categories (CPV)

Similar open tenders

About Swindon Borough Council

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.