NWRT - SAF-AS0522-P2 Fencing, hedgerow planting
Key facts
- Contract value
- £31,332
- Awarded
- 19 Feb 2024
- Buyer type
- Other public body
- Source
- Sell2Wales archive (Open Contracting)
Awarded to
| Supplier | Value |
|---|---|
| S.E.Metcalfe a'i Gwmni | £31,332 |
Description
Summary or worksSupply and install ~1050m of stock fencingSupply and install ~500m of double hedgerowSupply and install 6 x 12’ galvanised steel gatesSupply and install 6 x 400 gallon concrete troughs with hard standingDig to ploughing depth and lay ~1000m of 32mm water pipe to feed all troughs.Supply and install 1 x 10,000l header tank which will store water and feed the troughs via gravity system.Work specifications~1050m of stock fencing of fields along banks of the Afon Bach tributary, see map for details.Fence to be constructed using FSC certified, UC4 treated timber and high tensile wire. Strainer posts (~ 19) to be 7-8” diameter and at start, end and major changes in direction, supported by braced struts. Turning posts 5-6” (~ 13) used at minor changes in direction or height. Intermediate posts 3-4” diameter and no more than 11’ apart. 80 cm sheep netting with two strands of barbed wire, one above and one below the netting. Strainer posts and struts to be no closer than 2 m from the top of a steep bank, or if gentle sloped bank no closer than 2 m to the water’s edge. The exact positioning of the fence will be agreed between the contractor, landowner, and NWRT before installation. The finished fence height should be approximately 1.1m (44”). Use of a track machine is obligatory due to wet ground conditions likely to be encountered at this farm.Supply and install ~500m of double row hedgerow planting along the contour of the tributary (see maps attached). This is to be planted before the fencing. Typical species mix to include but not limited to: Blackthorn, hawthorn, gorse, hazel and dog rose. All planting must be in-keeping with current native species present in the area. No hedgerow planting at gate sites.Supply and hang 6 x 12’ galvanised steel access gates at locations in plan including self-closing springs with appropriate tie-back stakes/latches. Access gates should always be hung on gate posts which are railed to a strainer, never hung on the same post that wire is tensioned to.- Supply and install 6 x 400-gallon concrete drinking troughs with hard standing areas at locations shown in the site plan. All troughs need to be suitable for sheep and cattle.Supply and install 1 x 10,000l header tank. Construct a 32mm instream intake pipe 10m higher elevation than the header tank. This intake pipe will require a sufficient filter head to prevent debris/sediment entering the system. The intake pipe is to be placed in a suitably deep and sediment free pool.Piping – Dig trench for ~1000m of water supply pipe to ploughing depth. Pipe from watercourse abstraction point is to be one unbroken piece (no joints) of 25mm pipe (a 5m pipe is supplied, but if solar pump is placed further away from the watercourse, another suitable pipe will need sourcing). Piping from the water pump going to the troughs is to be 32mm ONLY with fast flow/low pressure ball valves on water troughs so water flow rate is not restricted. ANY joints fitted are to be suitable Plasson joints.As work will be completed out of the in-river season, no embedded abstraction point can be installed. However, it is also not worth embedding the abstraction pipe into the bank given the size of this tributary. A suitably deep pool will suffice for the abstraction pipe where it can be secured in the river bed and fed via gravity to the header tank which will supply water to all troughs at lower elevationsACCESS to site: (Make sure you have checked permissions for all access to the site not just the landowner i.e. if access crosses over different farmers fields). Give exact instructions on how to get to the site and how to enter. Is there a specified area to leave goods i.e. gravels? Is there hard terrain or bog? Is it suitable for all types of vehicles?All measurements are indicative, and quoted totals will be taken as definitive. It is the contractor’s obligation to clarify measurements to their own satisfaction, as adjustment to totals after completion cannot be made. Any additional works must be approved, otherwise payment cannot be made. Any brash clearing, tree work or other ground works required to install the scheme should be determined by the contractor and included in the initial quote.It is also the responsibility of the project officer and contractor to ensure that contracted works are not started WITHOUT A PROJECT OFFICER PRESENT. A project officer must be present at the beginning to brief all parties on the project. Failure to do so will void any contracts (and H&S policies) and payment may not be made. A project officer will meet you on the day of the works at 8am to outline the details. Please let NWRT know the times and dates of all works a minimum of 72 hours before the proposed works commence. A project officer may also follow up intermittently to check on the progress of the project (the frequency of this is dependent upon the complexity of the project). No other work than what is explicitly stated here is to be carried out unless approved by NWRT project manager. It is also the responsibility of the contractor to provide proof that all plant used are fit for purpose, as well as all relevant certifications.
Categories (CPV)
- 45342000 Erection of fencing
Similar open tenders
Allotment Track Repairs
Location: South EastBuyer: Gosport Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £65.00kSource Find a TenderGBC is inviting quotations for the supply, delivery and installation of track repairs at Brockhurst Allotment, Manor Way Allotment, and Middlecroft Allotment.
Roof replacement and associated works at Cork College of FET St Gobans College, Seskin, Bantry, Co Cork.
Location: IrelandBuyer: Cork Education and Training Board
Open tenderCloses 20 Nov, 202615 daysValue €2.00MSource TEDRoof replacement works, rooflights replacement, high level windows replacement, and all associated works.
Cuireadh chun Tairisceana: láithreán a dhiúscairt chuig Comhlacht Ceadaithe Tithíochta do thithíocht inacmhainne/Invitation to Tender: site disposal to an Approved Housing Body for affordable housing
Location: IrelandBuyer: Údarás Na Gaeltachta
Open tenderCloses 4 Dec, 202629 daysValue €150.00KSource TEDCuireadh chun Tairisceana chun láithreán a dhiúscairt go dtí Comhlacht Ceadaithe Tithíochta a d’fhéadfaí cóiríocht chónaithe inacmhainne, a d’fhéadfaí a thógáil, a dhíol agus a léasú, a chur ar fáil do Chainteoirí Gaeilge sna Doirí Beaga (Gaoth Dobhair), Co. Dhún na nGall d’Údarás na Gaeltachta. Invitation to Tender fo
Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council
Location: IrelandBuyer: Dublin City Council
Open tenderCloses 4 Dec, 202629 daysValue €48.00MSource TEDDublin City Council Housing Maintenance Section manages the repair and maintenance of the council's residential housing stock. Housing Maintenance Section serves 11 Housing Areas: Ballymun-Finglas, Artane-Whitehall, Donaghmede, Clontarf, Cabra-Glasnevin, North Inner City, South West Inner City, South East Inner City, B
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca