NWRT - Nant Garred Ddu Rocky Ramp NGarrDdu-Rramp-0001
Key facts
- Closing date
- 26 Jul 2024
- Procedure
- open
- Buyer type
- Other public body
- Source
- Sell2Wales archive (Open Contracting)
Description
Please contact the above email/telephone number to arrange a site visit or visit this open site yourself and contact us with any questions.Reinstate a rocky ramp/stepped pool that was previously installed. Please consult the above drawings.Scour pool infill:The scour pool immediately below the weir is too deep (1-1.5m depth depending on flow) to install all of the rocky ramp/stepped pool. This will require filling in partially (50%) with gravel/pebble material (0.05-0.25m sizes; ~12.5m3). The pool is approx. 5 x 5 m and is sloped into the centre of the pool. Once filled, this will need to be topped with a geotextile membrane which will be secured in place. The newly implemented rocky ramp/stepped pool will sit on top of this section. Gravel, pebble and cobble should be placed on top to form a new base layer.Rocky ramp:Large 0.5-3 tonne boulders will be required for the works (please provide an estimation of the amount required upon quoting, we estimate requiring 5-8 large boulders per “step”) as they need to be large enough to not move during high flow. Over a 25m distance from the weir working downstream, arrange boulders in a downstream facing arc at 5 metre intervals (see drawings above). One or a few of the boulders in each arc should be lower (into substrate) to allow water to chute over the top and provide an entry point for fish into the pool. The head difference (height of the water) between the lowest boulder(s) in each arc to be no more than 0.3m to the next consecutive pool up- or downstream. Boulders should be keyed into the bank and substrate where possible to increase stability and 12.5mm rebar can be used if needed to connect boulders. Boulders may be required around the edge of the scour pool downstream of the weir. Once boulders have been placed into the channel, gaps should be infilled with 0.05-0.25m gravel/pebbles to secure the boulders in place. Channel width is approx 5-6m over the 25m length. Normally the ramp is constructed in a downstream to upstream direction. Care must be taken to secure the downstream end of the ramp to prevent the toe from being removed in high flows. ‘Flow control’ rocks must also be used between the slots in each step (see image).Water diversion:The utilisation of a coffer dam (or similar) may be required to divert flow from each bank (to one half of the channel width) at a time in order to carry out the works on each side in a dry area.PLEASE consult the attached document for more details.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=142951.
This notice has been sent as a region specific notice. If you did not receive an alert about this you are not based in the specific region selected by the buying authority. Questions on why this was sent as a region specific notice should be sent to the buying authority.(WA Ref:142951)
Categories (CPV)
- 90700000 Environmental services
Similar open tenders
Bat Advice Service (2027)
Location: LondonBuyer: NATURAL ENGLAND
Open tenderCloses 1 Dec, 202626 daysValue £748.92kSource Find a TenderBats and their roosts are protected under Section 9 of the Wildlife and Countryside Act 1981 (as amended) and regulation 43 of the Conservation of Habitats and Species Regulations 2017 (as amended) The Conservation of Habitats and Species Regulations 2017. The legislation places obligations on both individuals and publ
Provision of Water Framework Directive (WFD) Related Services 2027 and 2028-2030 Inclusive
Location: IrelandBuyer: Waterways Ireland
Open tenderCloses 11 Dec, 202636 daysValue €390.00KSource TEDThe Water Framework Directive (WFD), Directive 2000/60/EC, was adopted in 2000 as a single piece of legislation covering rivers, lakes, groundwater and transitional (estuarine) and coastal waters. Its objectives include the attainment of good status in water bodies that are of lesser status at present and retaining goo
FCC/234/26 Establish a Multi Party Framework Agreement for Environmental Monitoring and Consultancy Work for Balleally and Dunsink Landfills with an Initial Contract for Fingal County Council
Location: IrelandBuyer: Fingal County Council
Open tenderCloses 8 Dec, 202633 daysValue €2.00MSource TEDEstablish a Multi Party Framework Agreement for Environmental Monitoring and Consultancy Work for Balleally and Dunsink Landfills with an Initial Contract for Fingal County Council
Management and Operation of Six Civic Amenity /Recycling Centres at Carndonagh, Dungloe, Laghey, Letterkenny, Milford and Stranorlar in County Donegal
Location: IrelandBuyer: Donegal County Council
Open tenderCloses 27 Nov, 202622 daysValue €1.40MSource TEDThe Operation and Management of 6 no Civic Amenity Sites concurrently at Carndonagh, Dungloe, Laghey, Letterkenny, Milford and Stranorlar. The services will generally comprise of - Handling and processing waste streams. - Monitoring and reporting (data collection, AERs etc). - Management systems and proven staff experi
Westgate Vision 2040 - Multi-Disciplinary Design Team (MDDT) Consultancy Service
Location: IrelandBuyer: Louth County Council
Open tenderCloses 25 Nov, 202620 daysValue €900.00KSource TEDDelivery of detailed design, tender and management of construction phase to handover for Westgate Vision Public Realm Scheme Character Area 1 and 2
North Northamptonshire Council - Operation & maintenance of landfill gas and leachate management systems at Corby closed landfill site
Location: East MidlandsBuyer: North Northamptonshire Council
Open tenderCloses 2 Dec, 202627 daysValue £273.00kSource Find a TenderCorby Closed Landfill is located on the northern outskirts of Corby. The landfill covers approximately thirteen (13) hectares. The volume of waste deposited into the site is unknown but is estimated to be in the order of 1.4Mm3 to a depth of around sixteen (16) metres. The buried waste produces landfill gas and leachat