HS2 Main Works S1 & S2 - WP023 - Crane Maintenance
Key facts
- Estimated value
- £2,500,000
- Closing date
- 06 Dec 2022
- Contract starts
- 06 Apr 2023
- Contract ends
- 30 Apr 2027
- Buyer type
- Other public body
Description
Skanska Costain Strabag Joint Venture (SCSJV) are seeking supply chain partners to provide crane maintenance services for the HS2 Main Works Civils Contract Area Central.
The Subcontractor provides all management, people, equipment, plant and materials, consumables (including fuels) and any other resources necessary to carry out and complete the items below.
Timing of work to be agreed 4 weeks prior to planned commencement. LOLER thorough examination of each crane (e.g., https://www.hse.gov.uk/work-equipment-machinery/thorough-examinations-lifting-equipment.htm). Periodic LOLER thorough examination according to LOLER requirements Including but not limited to: ÂWear checks and measurements on brakes, ropes, mechanical and electrical components ÂVisual inspections and functional checks of all components, including but not limited to brakes and safety devices ÂAll brakes are visually inspected thus ensuring that the brakes are working efficiently and without undue wear. ÂVisual checks for defects - all components. ÂVisual structural inspection of the crane. ÂNon-destructive testing, load testing and other tests as deemed appropriate by the competent person. ÂDisassembly or internal examination of parts as required to conduct the above examination items. ÂAny other checks as specified by the manufacturer. Report of inspection as per LOLER requirements (e.g. LOLER Schedule 1: https://www.legislation.gov.uk/uksi/1998/2307/schedule/1/made). Immediate notification to Contractor of any defects noted to be a danger to people. Schedule of examinations to be every 6 months initially (following examination at commissioning) then adjusted as needed according to as per a competent person recommendation taking into account the work environment and historical findings. Adhoc inspections maybe required in the event of exceptional circumstances (e.g. damage). Bimonthly servicing (every two months). This may be adjusted should the servicing reports indicates more, or less frequent inspections are required. Upon completion a detailed report to be provided to the Contractor. Quote for remedial works associated with any defects identified to be provided.
Servicing to consist, as a minimum, of the following: ÂWear and other defect checks of load ropes ÂAll safety devices are checked for correct operation and adjusted as required ÂAll electrical components are checked for wear, cleaned, and adjusted where necessary. ÂAll brakes are adjusted to the correct settings, thus ensuring that the brakes are working efficiently and without undue wear. ÂAll safety devices are checked for correct operation and adjusted if required. ÂAll mechanical components are checked for wear. ÂFull lubrication program as per OEM and/ or industry recommendations Subcontractor to provide a breakdown response service which includes out of hours unscheduled onsite work and over the phone assistance. This service to be provided 24x7 unless otherwise agreed.
Categories (CPV)
Similar open tenders
National Trust - NI - Lead Designer & Multidisciplinary team for capital works for CaR Visitor Infrastructure Project
Location: IrelandBuyer: THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
Open tenderCloses 2 Dec, 202627 daysValue £40.00kSource Contracts FinderThe National Trust is seeking to appoint a Lead Designer and multidisciplinary consultancy team to support the Carrick-a-Rede Visitor Infrastructure Project. This landmark project aims to sustainably grow visitor numbers to 250,000 annually within seven years, enhance the visitor experience, and strengthen Carrick-a-Re
Theatre Royal Plymouth - Architect-led Multi-disciplinary Design Team Services
Buyer: Theatre Royal Plymouth
Open tenderCloses 20 Nov, 202615 daysValue £750.00kSource Contracts FinderTheatre Royal Plymouth (TRP) are seeking an experienced Architect and Lead Designer-led multi disciplinary team to assist with the delivery of their Capital Programme - TRP Projects 1 and 2.
Footways Maintenance Survey (Lot 3) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 10 Nov, 20265 daysValue £60.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations to obtain road condition data for the highway network for footways and remote cycleways during 2027.
A, B & C Road Conditions Survey (Lot 2) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 10 Nov, 20265 daysValue £90.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations for the provision of A, B and C road condition surveys during 2027.
Multi-Disciplinary Consultancy Framework - Peterborough City Council
Location: East of EnglandBuyer: Peterborough City Council
Open tenderCloses 30 Nov, 202625 daysValue £30.00mSource Find a TenderThe Services required by the framework agreement, include but are not restricted to the following consultancy services (depending on which lot(s) is applied for, in respect of Peterborough City Council's corporate stock (properties): • Planning Consultancy • Disrepair Surveying • Retrofit Assessment/Coordination • Part
Unclassified Road Conditions Survey (Lot 1) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 10 Nov, 20265 daysValue £75.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations for the provision of Unclassified Road condition surveys during 2027.