GB-Edinburgh: HQ Refurbishment - Detailed Design Phase
Northern Lighthouse Board · Scotland
Key facts
- Estimated value
- £100,000
- Closing date
- 30 Jun 2021
- Contract starts
- 31 Aug 2021
- Contract ends
- 31 Dec 2021
- Procedure
- Open procedure
- Buyer type
- Central government
Description
The Northern Lighthouse Board has committed to carrying out a refurbishment of their Headquarter buildings at 84 George Street / 62 Rose Street North Lane. A number of pre-project and investigative works have been carried out regarding utilisation of space within the building, the presence of Asbestos, energy performance, fire safety & fire stopping within the building and the condition of the electrical infrastructure.
The electrical installation report, carried out in 2016, indicated various deficiencies with the current electrical installation within NLB-HQ. Much of the installation dates back to major refurbishments in the early 1970's and 1990's, and in the ensuing years many ad-hoc additions have been made. Specific issues include incomplete fire stopping and cables subjected to over-heating.
NLB believes that there is now an opportunity to upgrade the general workspace within the HQ buildings, with the aim of creating a more modern, more agile, smarter working environment for staff.
It is intended to make an investment in the building to bring the electrical installation up to current standards, followed by a general refurbishment of the building to make good these works and improve space utilisation. During 2020/21, Space Solutions carried out a space utilisation study of the building and have produced a recommended new design for the building layout, as detailed in their 2021 report. This design is to be taken as the basis of the new layout for the building rewire and refurbishment. In carrying out the refurbishment, there is also an opportunity to accrue benefits from carbon reduction and energy efficiency improvements as detailed within the Carbon Trust report of 2020, this report will be provided to the winning tenderer under a confidentiality agreement. We would also take the opportunity to improve the IT infrastructure, replacing Ethernet cabling with Cat6 standard cabling.
Work to date has covered RIBA (Royal Institute of British Architects) Plan of Work stages 0, 1, and parts of stage 2. The scope of this proposal is to continue this work to completion of Stages 2 - 4.
It is important that Tenderers or their representative(s) attend the supplier presentation day and site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Presentation Day will be conducted on Friday 2 July 2021. Site visits will be conducted on during the period Monday 5 July to Friday 9 July 2021. Please request via Delta eSourcing at https://www.delta-esourcing.com/ to confirm attendance
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Categories (CPV)
Similar open tenders
Lisnamult Access Road N63
Location: IrelandBuyer: Roscommon County Council
Open tenderCloses 3 Dec, 202628 daysValue €865.00KSource TEDConsisting of a new access road from the N63 to the townland of Lisnamult to access land with a potential for housing development. The project aims to provide active travel facilities
Ireland West SDZ Designated Activity Company DAC is seeking consultancy services to support the development of an Aviation Circular Economy Hub at Ireland West Airport Knock.
Location: IrelandBuyer: Mayo County Council
Open tenderCloses 24 Nov, 202619 daysValue €125.00KSource TEDMCC are publishing this competition on behalf of Ireland West SDZ Designated Activity Company. The brief is to undertake the market validation, technical, commercial and operational planning development work necessary to establish the proposed Hub’s viability. The tenderer shall identify an appropriate operating model
Provision of Site Assessment Services to the Abbey Theatre
Location: IrelandBuyer: Abbey Theatre Amharclann na Mainistreach
Open tenderCloses 9 Dec, 202634 daysValue €139.00KSource TEDThe procurement of services to carry out a Building Condition Survey, which documents the building prior to change and gives an independent opinion on its condition as well as recommendations for the level of intervention required to meet the operational, accessibility, sustainability and technical requirements of a mo
Provision of Water Framework Directive (WFD) Related Services 2027 and 2028-2030 Inclusive
Location: IrelandBuyer: Waterways Ireland
Open tenderCloses 11 Dec, 202636 daysValue €390.00KSource TEDThe Water Framework Directive (WFD), Directive 2000/60/EC, was adopted in 2000 as a single piece of legislation covering rivers, lakes, groundwater and transitional (estuarine) and coastal waters. Its objectives include the attainment of good status in water bodies that are of lesser status at present and retaining goo
Lifford- Stranorlar Community Trails Plan
Location: IrelandBuyer: Ballybofey and Stranorlar Integrated Community Company
Open tenderCloses 24 Nov, 202619 daysValue €24.50KSource TEDBassic Enterprise wish to appoint suitably qualified and experienced professional services and as such now seek quotations from suitably qualified consultants to develop and deliver a Community Trails Plan for the Lifford-Stranorlar Municipal District in County Donegal.
Westgate Vision 2040 - Multi-Disciplinary Design Team (MDDT) Consultancy Service
Location: IrelandBuyer: Louth County Council
Open tenderCloses 25 Nov, 202620 daysValue €900.00KSource TEDDelivery of detailed design, tender and management of construction phase to handover for Westgate Vision Public Realm Scheme Character Area 1 and 2