Bournbrook Residences External Improvements
THE UNIVERSITY OF BIRMINGHAM · West Midlands
Key facts
- Contract value
- £396,210
- Awarded
- 11 Oct 2020
- Contract starts
- 18 Oct 2020
- Contract ends
- 28 Jan 2021
- Procedure
- Call-off from a framework agreement (framework)
- Buyer type
- Education
Awarded to
| Supplier | Value |
|---|---|
| GTH CONSTRUCTION LIMITED | £396,210 |
Description
⢠Erect scaffold to front elevation where required. ⢠Take delivery of mewp and scissor lift for rear elevation. ⢠Strip all cladding as required in order to expose all areas of fire barriers in positions indicated on the elevation drawings. Store on site ⢠Cut vertical rails to assist removal of fire barriers and insulation. ⢠Remove old fire barriers ⢠Cut out insulation above and below old fire barriers. ⢠Fit 2no "L" brackets to vertical rails (one above cut and one below cut). ⢠Install AIM galvanised fixing clip & screw as per manufacturers specification. ⢠Install 75mm (60mins) AIM Fire Cavity Barrier to manufacturers specification. Barriers to be installed to window header, jamb and sill to form continuous fire barrier around window opening and intumescent mastic used to close any gaps. Barrier to fully fill cavity and fit tightly to the inside face of the panel. Allow 5% compression in the barrier when installing to ensure a tight fit to panel. ⢠Barrier to be fitted between existing vertical rails and helping hand brackets as required. Rails to be cut/altered as required to allow correct fitting of the barrier. Barrier sections must be butted tightly together on all sides and intumescent mastic used to close any gaps. ⢠Install 75mm (60mins) AIM Fire Cavity Barrier to manufacturers specification to horizontal and vertical party wall/floor lines. Barrier to fully fill cavity and fit tightly to the inside face of the panel. Allow 5% compression in the barrier when installing to ensure a tight fit to panel. ⢠Barrier to be fitted between existing vertical rails and helping hand brackets as required. Rails to be cut/altered as required to allow correct fitting of the barrier. Barrier sections must be butted tightly together on all sides and intumescent mastic used to close any gaps. ⢠Reinstall Trespa panels or fit new (as required) to existing rails where possible. New panels to be like for like replacements. Where not possible fit panels using TS700 visible fixings (powder coated to RAL TBC). Fixings fitted to new Z rail. Rail to be clear of barrier. ⢠Fit new 200mm foil faced insulation above fire barrier to replace old insulation, and tape all joints (not over fire barrier as previous install). ⢠Install fire barrier around 27no duct vents. ⢠Carefully reinstate all cladding to elevations. ⢠Clear site away including all old insulation and fire barriers. ⢠Site compound area to be located in rear service yard.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202621 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202644 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved
Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, Farnham
Location: South EastBuyer: Waverley Borough Council
Open tenderCloses 30 Nov, 202626 daysValue £78.00kSource Find a TenderGuildford Borough Council is seeking to appoint a suitably qualified and experienced contractor to design, supply, install, test and commission a roof-mounted Solar Photovoltaic (PV) system at The Enterprise Centre, Farnham. The project forms part of the Council's commitment to reducing carbon emissions, improving ener
GH2011 Kitchen and Bathrooms Refurbishment
Location: United KingdomBuyer: Golding Homes
Open tenderCloses 20 Nov, 202616 daysValue £21.00mSource Find a TenderThis is a project for the refurbishment of kitchens and bathrooms to properties owned and managed by The Client for 3 years with the option to extend by further 2 years.
Framework Agreement for the Application of Mould Treatment
Location: WalesBuyer: City & County of Swansea
Open tenderCloses 4 Dec, 202630 daysValue £400.00kSource Find a TenderThe City and County of Swansea (the Employer) requires competent and experienced Contractors to deliver mould treatment works across its housing stock. The Framework Agreement will support the effective management of damp and mould in both occupied and void domestic properties, including communal areas, throughout Swa
Refurbishment of Seven Public Conveniences for West Oxfordshire District Council
Location: South EastBuyer: West Oxfordshire District Council
Open tenderCloses 25 Nov, 202621 daysValue £200.00kSource Find a TenderWest Oxfordshire District Council (the Authority) aims to significantly improve the facilities it retains to provide good quality, user-friendly and accessible public conveniences. This is a Design and Build contract, utilising the JCT Minor Works Building Contract with Contractor’s Design 2024, that covers three diff