Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Key facts
- Contract value
- £43,000
- Awarded
- 01 Dec 2020
- Contract starts
- 01 Dec 2020
- Contract ends
- 06 May 2021
- Procedure
- Other - .
- Buyer type
- Other public body
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works.
Section 4: Scope of Works
Part 1) Scope of Supply Attenuation Tank:-
BMB JV require fabrication and supply of permanent formwork for an Attenuation Tank at Hammersmith site. Panels shall be made to the geometry displayed in the drawings provided for the Attenuation Tank. All panels are to be laminated as the soffit will be submerged by BMB JV systematically.
Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence. Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply. All supporting documentation for a material compliance report should be provided prior to order delivery. No openings are required as BMB JV will post cut on site.
Attenuation Tank Building Drawings 3320-AAJVX-HAMPS-540-SZ-DR-000040 3320-AAJVX-HAMPS-540-SZ-DR-000041
Part 2) Hammersmith Shaft Scope of Supply: -
BMB JV require fabrication and supply of permanent formwork for a drop shaft at Hammersmith site. The supplier is to conduct a design check on the panels proposed for permanent and temporary loadings and spans for the Hammersmith Shaft. Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply. Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence. Supplier will produce manufacturing drawings for panel layout for BMB's approval. All documentation to be supplied for panel layout to be checked by BMB temporary works department before commencement
Additional information: BMB-JV Tideway West, Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD
Categories (CPV)
Similar open tenders
Tender 23/2026 - SUPPLY AND DELIVERY OF WORKSHOP TOOLBOXES COMPLETE WITH TOOLS
Location: Northern IrelandBuyer: Newry, Mourne and Down District Council (NMD)
Open tenderCloses 2 Dec, 202627 daysSource Find a TenderNewry, Mourne and Down District Council invite suppliers to tender for the provision of a total of 10 toolboxes complete with tools. This is to equip the workshop personnel with the appropriate tooling to maintain Council vehicles, plant, and equipment to a high standard in line with industry guidelines and statutory r
BBV Sublot 4 - HSST1020 - SALTLEY VIADUCT GABION WALL
Buyer: Balfour Beatty VINCI JV HS2
Open tenderCloses 13 Nov, 20268 daysValue £1.00mSource Contracts FinderOpportunity Summary - Gabion Retaining Wall Works We are seeking experienced suppliers and subcontractors to provide the supply, delivery and installation of a gabion retaining wall system as part of a civil engineering project. Scope of Requirements The successful supplier shall be responsible for: Supply
Supply of EURO Heavyweight and Lightweight Pallets for West Midlands Fire and Rescue Authority 2026 - 2030
Location: United KingdomBuyer: West Midlands Fire and Rescue Authority
Open tenderCloses 4 Dec, 202629 daysValue £250.00kSource Find a TenderWest Midlands Fire and Rescue Authority (the Authority) is seeking to award a Contract for the provision of Euro Heavyweight and Lightweight pallets.
Provision of Surface Dressing Chips
Location: ScotlandBuyer: Tayside Contracts
Open tenderCloses 2 Dec, 202627 daysValue £500.00kSource Public Contracts ScotlandTayside Contracts requires suitably experienced Suppliers to provide a reliable, responsive and cost-effective supply of Surface Dressing Chips for use on annual road maintenance and surface dressing programmes undertaken on behalf of Angus Council, Dundee City Council, Perth & Kinross Council and other external client
Dunsallagh/Killernan GWS Civil Engineering works to upgrade infrastructure
Location: IrelandBuyer: Dunsallagh/Killernan GWS
Open tenderCloses 16 Nov, 202611 daysValue €460.00KSource TEDDunsallagh/Killernan GWS are undertaking an upgrade of approx 5km section of existing 2" watermain to 4". Section A. Approximately 2.6km, from Doonsallagh West to the R474. Section B. Approximately 2.5km of roadway, from the junction of Knockbrack road and the R427 heading west. The works will require consulting engine
ITT for Supply of Windows & Doors for Individuals Batch 05 (T1398)
Location: ScotlandBuyer: Dundee City Council
Open tenderCloses 4 Dec, 202629 daysValue £220.00kSource Find a TenderManufacture, supply and delivery of uPVC windows and doors for Individuals Batch 05. This contract is for supply only as installation will be undertaken by DCC Construction Services.