SASWP03.2 - Rail Systems - Signalling, Telecoms, E&P (LV), P-Way, Civils
Key facts
- Estimated value
- £2,500,000
- Closing date
- 31 Mar 2021
- Contract starts
- 24 Jun 2021
- Contract ends
- 30 Jun 2022
- Buyer type
- Utilities & transport
Description
Skanska SAS13 Bridge Replacement - Rail Systems WP03.2 Scope
1) Signalling:
Assets to be disconnected and reinstated during blockade: - 1 No. Signal - 2 No. Axle counters - AWS
Cabling to be Disconnected and Renewed: - AWS - 2c Power cables to LOC's - 2C data cable - Axle cable tail cables - 2pr cable to axle counter - Axle counter 10pr multicore cables
2) Telecoms:
Cable replacement Fibre Optic and copper: - 30pr C STUB SCYA B cable (30pr C STUB SCYA B cable (blockade) - 24f F SPUR SCYA - 48f F BIMC NUNC A - 48f WCML (blockade)
Testing of Signalling cables: - Copper cables 2 x 10pr and 1 x 2pr telecoms cables used for Signalling functions
3) E&P (LV) 240V DNO Power Supply to Star City TEH
Diversion in temporary route: 600lm Cable Installation through existingDBP3 Cess Trough Route, 5 Track UTX, 2no. URX's and elevated trough route. Testing and commissioning of supply and EIS of THE DNO Power.
Cable Diversion in New Route: 600lm Cable Installation through existing DBP3 Cess Trough Route, New Viaduct Cable Route and 1 no. Dual Track UTX.
Removal of Temporary DNO Cabling
4) Track:
Stage 1 Track - Pre Blockade - Weekend Disruptive Possessions: - Full Track Reconstruction of Circa 50lm of Dual Track Rail inc 7.5m Ballast Ramps at tie-in - 115lm of Lift and Slew on Approaches, both roads.
Stage 2 Track - Main Blockade - Removal of 200lm of Dual Track at commencement of Blockade to facilitate Civils Works - Full Track Reconstruction of Circa 200lm of Dual Track Rail inc 7.5m Ballast Ramps at tie-in - 350lm of Lift and Slew on Approaches, both roads - Installation of 2 no. CEN 60 Structural Expansion Joints (SEJ) - Installation of 2 no. CEN 60to CEN56 Track Adjustment Switches
All Track Works Include: - Install New & Serviceable Rails, Sleepers, Top & Bottom Stone, Geogrid Membrane and Tamp & Line Welding & Stressing, Follow Up Tamping, CRT Management
5) Civils:
Dual Track UTX: Installation during Blockade, 6 Way Multiduct, 2 no. 1.2m proprietary chambers. Circa 12m Long
Track Side S&T Route 100lm of TTS 200 or similar Troughing in Cess, inc 2 no. connections to UTX.
Temporary S&T Route 300lm Cable Trough Route Removal
6) Supply of Track, Signalling, Telecoms & E&P CRE for Works Supply of Signalling and Telecoms Testers for Works Supply of Rail System Manager, embedded within SAS 13 Project Team to Manage all Rail Systems Disciples Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete.
The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include: Health & Safety Quality Sustainability Environmental Competence Capability Capacity Commercial Price
Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team.
Best and final offers may be requested from tenderers. Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3).
The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.
Categories (CPV)
Similar open tenders
ENQ1406 - LED Screens, Staging, PA Equipment and Lighting Equipment for Derby LIVE Events
Location: East MidlandsBuyer: Derby City Council
Open tenderCloses 11 Nov, 20266 daysValue £95.00kSource Find a TenderThis quotation is for the supply, installation and de-rig of staging, LED screens, PA and Lighting equipment for Derby LIVE Events. **Please note this procurement has been reserved to suppliers with substantive business operations within the administrative boundary of Derby City Council. The Council is committed to sup
Offer trydanol a llusernau goleuadau stryd / Street lighting electrical equipment and lanterns
Location: WalesBuyer: Flintshire County Council
Open tenderCloses 25 Nov, 202620 daysValue £1.00Source Find a TenderCyflenwi lanternau goleuadau stryd newydd i Gyngor Sir y Fflint, gan gynnwys o ddanfon i gefnogaeth cynnal a chadw, adnewyddu asedau diwedd oes a/neu welliannau effeithlonrwydd ynni trwy LED a thechnoleg gyrrwr newydd. The supply of replacement street lighting lanterns for Flintshire County Council, including delivery
Life Safety System (LSS) Inspections, Servicing and Associated Maintenance, Upgrades and/or Repairs
Location: IrelandBuyer: Tuath Housing Association Ltd
Open tenderCloses 9 Dec, 202634 daysValue €5.00MSource TEDTuath Housing Association invites tenders from suitably qualified and experienced electrical contractor to undertake Life Safety System (LSS) inspections, servicing and associated maintenance, upgrades and/or repairs on selected Tuath Housing Association properties. This initiative is part of an ongoing asset managemen
Early Years Experience ”Hey Duggee’s Big Day Out“ Experience Designer
Location: United KingdomBuyer: Science Museum Group
Open tenderCloses 20 Nov, 202615 daysValue £70.00kSource Find a TenderThe Science Museum Group (SMG) wishes to award a contract for the provision of design services for the 2028 Hey Duggee experience at the Science and Industry Museum. SIM seeks to appoint a Designer to provide full design services for this experience, including 3D design and 2D design, with the option to provide lightin
WUTH-ITT-C484988 Minor, Small & Medium Works
Location: United KingdomBuyer: WIRRAL UNIVERSITY TEACHING HOSPITAL NHS FOUNDATION TRUST
Open tenderCloses 8 Dec, 202633 daysValue £40.00mSource Find a TenderThe Contracting Authority is seeking to establish a Framework for provision of minor, small & medium works across its own sites and for any other participating authority as named in the ITT. The Framework will be for a period of 12 months with the option to extend for a further 12 months (maximum duration 2 years). The
Construction, Repairs and Maintenance Framework
Location: Yorkshire and the HumberBuyer: North Lincolnshire Council
Open tenderCloses 30 Nov, 202625 daysValue £62.40mSource Find a TenderNorth Lincolnshire Council is establishing a series of Frameworks to provide flexible, compliant and commercially robust mechanisms for the delivery of construction, maintenance, repair and infrastructure services across its estate and wider asset portfolio