Natural flood management and infrastructure improvement works at Blean Woods.
Key facts
- Closing date
- 16 Aug 2021
- Contract starts
- 31 Aug 2021
- Contract ends
- 28 Feb 2022
- Procedure
- Open procedure (below threshold)
- Buyer type
- Other public body
Description
The RSPB has secured funding through the Green Recovery Challenge Fund to deliver the 'Climate Resilience for Blean Woods and Seasalter Levels' project. The funding is administered by The National Lottery Heritage Fund in partnership with Natural England and the Environment Agency. The overall aim of the works within this document is to enhance the resilience of Blean Woods to projected changes in climate, through reversing the effects of man-made drainage and increasing water retention within the woodland, in addition to improving accessibility. The work will be carried out across one RSPB reserve and two Kent Wildlife Trust (KWT) reserves, which total 1328ha of woodland, 999ha of which is designated as SSSI.
Climate change projections predict increased rainfall in winter, but hotter and drier summers, particularly in the south of England. Drier spring and summers coupled with man-made drainage features in the woodland will result in Blean Woods drying out at an accelerated rate in the spring. The lack of moist soil and standing water will result in fewer invertebrates, less deadwood generation and fewer drinking opportunities - all vital to support a healthy woodland for wildlife. To mitigate against this, we aim to slow the drainage of high rainfall events from Blean Woods to retain that water on site for longer as both standing water and moisture content in soils. The project will create earth and wood dams in primary watercourses to achieve this aim, using site-won materials.
The work will focus on using Natural Flood Management (NFM) principles that have been used for flood management projects - working along key watercourses at all 3 sites to slow the flow using predominantly wood dams and some earth dams. This tender also includes works for 2 exciting sub-projects using the same principles: restoration of the Sarre Penn at RSPB Blean and a raised bog at KWT South Blean. The Sarre Penn is the largest watercourse at RSPB Blean that has been artificially straightened for drainage in certain locations - leaving the historic meanders 'high and dry'. This project will aim to restore these natural meanders to their former glory, as well as slowing the high winter flows of the overall channel. The bog restoration will involve increasing water retention using wood and earth dams, and tree clearance to create a diverse mosaic of wet woodland and ancient bog habitats. In addition to the exciting and unique habitat works, we also have infrastructure improvements to complete that involve trackside ditching, crossing point improvements and the construction of a boardwalk - all to improve the accessibility and overall visitor experience of our sites.
Details of how to apply in Tender document attached
Additional information: The tender document is divided into 3 lots due to the different and specialised nature of the project. The lots correspond with the 3 different sites the contractor(s) will be working on. These lots are then divided into subsections based on the type of work, and contractors are welcome to bid for these individual subsections, or one or more entire lots.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Procurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base
Location: East of EnglandBuyer: Thurrock Council
Open tenderCloses 30 Nov, 202625 daysValue £600.00kSource Find a TenderProcurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base. The works comprise two elements: the construction of a new single-storey extension of approximately 33m² to provide a secure entrance foyer, office, accessible WC, meeting room and circulation space; and the inte
Acle Bridge toilet block access, landscaping and drainage improvements
Location: East of EnglandBuyer: Broads Authority
Open tenderCloses 3 Dec, 202628 daysValue £100.00kSource Find a TenderThe Broads Authority is seeking a suitably qualified and experienced contractor to carry out access, landscaping and drainage improvement works at our Acle Bridge toilet block. The works will involve breaking up and removing existing surfacing, raising ground levels, installing new paving and creating sloped access poi
Door Entry Phased Replacement Programme 2026-27
Location: LondonBuyer: London Borough of Hillingdon
Open tenderCloses 2 Dec, 202627 daysValue £200.00kSource Find a TenderThe London Borough of Hillingdon (LBH) intends to install/upgrade the Door Entry/Access Control to 40 low and medium rise blocks. This work will be based on a planned program. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete and fully functional audio door
Crane Provision Framework
Location: South EastBuyer: KBS Maritime Ltd
Open tenderCloses 3 Dec, 202628 daysValue £4.00mSource Find a TenderKBS Maritime is seeking to establish a multi-supplier Framework for complete third-party crane services in support of Alongside Services operations. The Framework will supplement, not replace, KBS internal Heavy Lift capability and will provide planned surge, operational resilience, out-of-hours support, concurrent-lif
lumbing PPM and reactive repairs for Hertfordshire Police
Location: East of EnglandBuyer: The Police and Crime Commissioner for Hertfordshire
Open tenderCloses 3 Dec, 202628 daysValue £371.50kSource Find a Tenderlumbing PPM and reactive repairs for Hertfordshire Constabulary
Allotment Track Repairs
Location: South EastBuyer: Gosport Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £65.00kSource Find a TenderGBC is inviting quotations for the supply, delivery and installation of track repairs at Brockhurst Allotment, Manor Way Allotment, and Middlecroft Allotment.