Skip to content
Tenfell
Closed tender
Published 24 Sep 2021

Air temp & RH sensors 2

University of Salford · North West

Key facts

Estimated value
£20,000
Closing date
01 Oct 2021
Contract starts
01 Nov 2021
Contract ends
31 Oct 2022
Procedure
Open procedure (below threshold)
Buyer type
Education

Description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford, Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energyhouse ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features: • 2 large chambers capable of having 2 family homes built in each one (4 homes in total) • Temperature controlled to within 0.5 °C from -20°C to +40 °C • Wind, rain, solar radiation and snow can be generated • These conditions provide testing facilities for housing covering 95% of the global population. The Energy House 2 Project has a requirement to measure RH&T in a chamber environment. These sensors will form part of a sensor network over 300 sensors. These will report back into a database using the SDI12 standard. Please go to InTend for full tender documentation: https://in-tendhost.co.uk/salford/aspx/Home

Additional information: Please send all correspondence via our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home

Categories (CPV)

Similar open tenders

About University of Salford

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.