Key facts
- Estimated value
- £20,000
- Closing date
- 08 Feb 2019
- Contract starts
- 01 Mar 2019
- Contract ends
- 30 Apr 2019
- Procedure
- Open procedure (below threshold)
- Buyer type
- Other public body
Description
1 Background/Introduction Wave-tricty Ltd intends to construct a full-scale concrete hybrid generation platform, which will be a large and complex build. detailed engineering design is anticipated to commence in Q1 2019. The platform hull will be a ship-shaped barge circa 100m x 25m and will be constructed from marine grade concrete. Project Specifications 2 There are a number of construction methodologies available to build this type of structure, each with varying advantages and disadvantages with respect to the design of the platform hull. The requirement is to conduct construction feasibility study to provide the Wave-tricty Ltd design team with a recommended construction methodology prior to starting detailed engineering. This will minimise design risk and cost during the next phase of works and allow for early engagement with potential fabrication sites for the platform.
SCOPE
In undertaking this study, the following areas shall be investigated and evaluated in terms of technical advantages and disadvantages. An associated high-level qualitative cost analysis shall also be presented, in order to provide final recommendation of a suitable construction strategy:
A summary and background information of each platform hull construction methodology shall be presented to include but not be limited to: ⢠Reinforced concrete (cast in situ or precast); ⢠In-situ monolithic casting (slip form); ⢠In-situ casting using precast elements (slab, honeycomb structure); ⢠Pre-stressed concrete; ⢠Post-tension concrete.
Identification of the likely construction facilities that will be required: ⢠Any specific quayside water-depths to ensure sufficient clearance of the build at various stages of construction and load-out; ⢠Review use of assembly areas - precast assembly area for modular build and full assembly; ⢠How precast elements could be used and limiting factors, considering transportation (road, ship etc.) and platform requirements for modular build; ⢠Review cranage - evaluate maximum capacity of cranes required at various boom reach with an estimate of largest precast frame, module;
Platform hull build methodology: The following main build concepts shall be investigated and reported: Construction build within a dry-dock: ⢠Calculation of minimum number of platform hull elements (horizontal position) to determine required buoyancy to float-out the platform hull prior to flooding dock and tow platform hull to quayside to complete build and fit-out; ⢠Associated costs with occupying dry-dock for duration of build; ⢠Discuss opportunities of flooding dock, whilst building platform, evaluate consequences of disruption of build, wash down event etc. ⢠Evaluate slip-forming methodology of constructing the platform in a vertical position in the dry-dock; ⢠Evaluate methods on over-turning platform hull to its longitudinal position (if feasible);
Floating barge construction: ⢠Build platform on top of barge(s); ⢠Capital Expenditure (CAPEX) of purchas
Additional information: Note minor mendments to attachment and scope wording
Categories (CPV)
- 71330000 Miscellaneous engineering services
Similar open tenders
National Trust - NI - Lead Designer & Multidisciplinary team for capital works for CaR Visitor Infrastructure Project
Location: IrelandBuyer: THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
Open tenderCloses 2 Dec, 202627 daysValue £40.00kSource Contracts FinderThe National Trust is seeking to appoint a Lead Designer and multidisciplinary consultancy team to support the Carrick-a-Rede Visitor Infrastructure Project. This landmark project aims to sustainably grow visitor numbers to 250,000 annually within seven years, enhance the visitor experience, and strengthen Carrick-a-Re
Theatre Royal Plymouth - Architect-led Multi-disciplinary Design Team Services
Buyer: Theatre Royal Plymouth
Open tenderCloses 20 Nov, 202615 daysValue £750.00kSource Contracts FinderTheatre Royal Plymouth (TRP) are seeking an experienced Architect and Lead Designer-led multi disciplinary team to assist with the delivery of their Capital Programme - TRP Projects 1 and 2.
Footways Maintenance Survey (Lot 3) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 10 Nov, 20265 daysValue £60.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations to obtain road condition data for the highway network for footways and remote cycleways during 2027.
A, B & C Road Conditions Survey (Lot 2) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 10 Nov, 20265 daysValue £90.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations for the provision of A, B and C road condition surveys during 2027.
Multi-Disciplinary Consultancy Framework - Peterborough City Council
Location: East of EnglandBuyer: Peterborough City Council
Open tenderCloses 30 Nov, 202625 daysValue £30.00mSource Find a TenderThe Services required by the framework agreement, include but are not restricted to the following consultancy services (depending on which lot(s) is applied for, in respect of Peterborough City Council's corporate stock (properties): • Planning Consultancy • Disrepair Surveying • Retrofit Assessment/Coordination • Part
Unclassified Road Conditions Survey (Lot 1) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 10 Nov, 20265 daysValue £75.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations for the provision of Unclassified Road condition surveys during 2027.