NMRN Storehouse 12 Collection Project PQQ Capital Works
THE NATIONAL MUSEUM OF THE ROYAL NAVY · United Kingdom
Key facts
- Estimated value
- £1,100,000
- Contract starts
- 30 Apr 2019
- Contract ends
- 01 Mar 2020
- Procedure
- Open procedure (below threshold)
- Buyer type
- Other public body
Description
The project comprises refurbishment of parts of the ground floor and all of the first floor of Storehouse 12 (SH12), a long and narrow brick-built warehouse building located within Portsmouth Historic Dockyard, dating from around 1860. This structure is not listed although it does lie within a Conservation area and the secure side of Portsmouth Naval Base. Storehouse 12 is just over 90m long by 8m wide with storey heights of approximately 5m and divided into three 'blocks' separated at Ground floor level by two former 'carriageway' spaces passing through the width of the structure, referred to as the North and South carriageways. The Ground floor of the building is currently occupied by the NMRN and the majority of the Ground Floor will remain in occupation and use throughout the course of the contract. The North and South carriageways will be vacated for the duration of the refurbishment works, with the Library/ Workspace area in Block 3 (adjacent to the South Carriageway) in use but then handed over to the Contractor for a Redecorations Refurbishment towards the end of the contract works. The other two Blocks at Ground floor level contain important document archives, and these must be kept sealed off and protected from the contract works taking place adjacent and on the floor above for the duration of the works, with NMRM staff permitted regular e.g. weekly access to inspect these areas. The works consist mainly of the refurbishment of the First floor to create two large storage spaces in Blocks 1 and 2 for incoming collections items belonging to the NMRN's collection, a staff workspace area and associated other facilities including: ⢠New goods lift installed within existing lift shaft ⢠Photography studio ⢠Conservation lab ⢠Two Secure stores ⢠Staircase enclosures ⢠Area for installation of a walk-in low temperature freezer to be installed by Employers direct works contractor The First floor will be thermally upgraded by installing new internal thermal linings to the walls and to the pitched internal roof soffit, to work in conjunction with minimal plant to provide mostly passively-conditioned storage and working space. The existing concrete floor will be refurbished and sealed, and two localised areas infilled with a timber infill floor structure. Insulated window infill panels will be fitted to most of the windows. The First floor will be completely re-serviced with electrical, lighting and data and life safety systems fed from existing incoming supplies. On the Ground floor a dedicated store room will be created for photographs and negatives and the two carriageways will become new entrance spaces. The works also include alterations required to the external walls to create new entrances to the North and South carriageway spaces on the East elevation, block up existing redundant fire exit doors, and to add a no. of new ventilation airbricks below window bays at First floor level. Full details available in uploads
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Roof replacement and associated works at Cork College of FET St Gobans College, Seskin, Bantry, Co Cork.
Location: IrelandBuyer: Cork Education and Training Board
Open tenderCloses 20 Nov, 202615 daysValue €2.00MSource TEDRoof replacement works, rooflights replacement, high level windows replacement, and all associated works.
Cuireadh chun Tairisceana: láithreán a dhiúscairt chuig Comhlacht Ceadaithe Tithíochta do thithíocht inacmhainne/Invitation to Tender: site disposal to an Approved Housing Body for affordable housing
Location: IrelandBuyer: Údarás Na Gaeltachta
Open tenderCloses 4 Dec, 202629 daysValue €150.00KSource TEDCuireadh chun Tairisceana chun láithreán a dhiúscairt go dtí Comhlacht Ceadaithe Tithíochta a d’fhéadfaí cóiríocht chónaithe inacmhainne, a d’fhéadfaí a thógáil, a dhíol agus a léasú, a chur ar fáil do Chainteoirí Gaeilge sna Doirí Beaga (Gaoth Dobhair), Co. Dhún na nGall d’Údarás na Gaeltachta. Invitation to Tender fo
Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council
Location: IrelandBuyer: Dublin City Council
Open tenderCloses 4 Dec, 202629 daysValue €48.00MSource TEDDublin City Council Housing Maintenance Section manages the repair and maintenance of the council's residential housing stock. Housing Maintenance Section serves 11 Housing Areas: Ballymun-Finglas, Artane-Whitehall, Donaghmede, Clontarf, Cabra-Glasnevin, North Inner City, South West Inner City, South East Inner City, B
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202643 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved