GB-London: Feasibility Study into East Wing Switchboard Replacement

National Maritime Museum · United Kingdom

Key facts

Estimated value
£25,000
Closing date
24 Jun 2019
Contract starts
30 Jun 2019
Contract ends
31 Oct 2019
Procedure
Open procedure
Buyer type
Other public body

Description

The Contractor will need to carry out a detailed feasibility report for the replacement of the East Wing switchboard. •Establish locations for data logging to measure power consumption. •Undertake a detailed site survey to establish the load centres save and the address and destination of all associated LV cables. •Establish size of current conductors and assess load characteristics to confirm compliance with current BS7671. •Map all cable routs into and out of the switch room including containment. •Develop a changeover philosophy and plan that enables service to be maintained to minimise shutdowns. •Consider the phasing of the works and execution. •Produce design intent drawings. •Provide an indicative programme of the works. •Provide an indication of cost based around actual estimates for the work to provide accurate and reliable forecasts •Draw together all facets of the feasibility study into a single document with detailed sections and appendices for all specialist input and associated details.

Additional information: Please inform the NMM by Email only if you wish to express an interest in this project. Relevant 'Request for Quotation' documentation will then be Emailed.

Please note the NMM/ROG is part of a UNESCO World Heritage Site and this building is Grade 2 Listed. Specific experience in this field will be essential.

Categories (CPV)

Similar open tenders

About National Maritime Museum

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.