Commissioning Management Compliance Services

University College London · London

Key facts

Estimated value
£200,000
Closing date
03 Apr 2019
Contract starts
15 Apr 2019
Contract ends
28 Nov 2024
Procedure
Single tender action (below threshold)
Buyer type
Education

Description

UCL acquired the Eastman Dental Hospital (EDH) site in February 2018. The EDH site is made of the former Royal Free Hospital (RFH), Levy Wing and Eastman Dental Clinic. The project is currently at commencement of RIBA Stage 4, which will be complete in November 2019.

The Consultant provides the services of a Commissioning Management Compliance Monitor, including post contract, support to the Supervisor in fulfilling their role under the NEC3 Engineering and Construction Contract. The services to be provided are output specific at defined intervals and cover the following: RIBA Stage 4 - Technical Design (including procurement).

The Consultant does the work necessary to complete all of the activities listed in Sections 1 to 3 of the scope enclosed in the tender documents. The activities listed are not necessarily consecutive or concurrent but are completed as required to provide the services.

The Consultant should note that their responsibility covers the whole project delivery not just the relevant duties for a particular stage, so that during each project stage, the advance planning of tasks and duties in future stages and strategies that extend beyond the project life cycle (e.g. operation and maintenance) need to be considered.

Whilst carrying out the duties the Consultant shall liaise fully with the Project Manager.

The Commissioning Manager will act predominantly in an auditing and compliance capacity, making sure the appropriate documentation and activities are undertaken by others.

The emerging design proposals (GIA 17,500m2) include block retention of the Alexandra Wing which fronts onto Gray's Inn Road, with full demolition of Sussex, Victoria and Levy Wings, that formed the previous courtyard behind. An existing (listed) fountain in the current courtyard will be retained and relocated. The three demolished wings including courtyard will be replaced with new construction suitable for modern science forming an internal quadrangle using part enclosed (flexible) and external (garden) space, with connections above ground level and public realm between new and old. The current working occupancy level for the building is c535 persons.

Categories (CPV)

Similar open tenders

About University College London

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.