Published 12 Dec 2017

PR3930-WH-Boiler Replacement at Goodinge Health Centre.

Partners Procurement Service · United Kingdom

Key facts

Contract value
£41,394
Awarded
30 Aug 2017
Contract starts
31 Aug 2017
Contract ends
31 Dec 2017
Procedure
Not applicable
Buyer type
Other public body

Awarded to

SupplierValue
BSW HEATING LTD£41,394

Description

The contractor shall allow to install the new boiler, associated equipment and controls prior to the replacement of the existing boilers expansion vessel and safety valve. This is to ensure that the heating and hot water to the day care centre and health clinic are not affected by the works in any way with the exception of the flue works which must be undertaken in close liaison with the building operators. The contractor shall allow for all necessary temporary power etc. to enable the above clause to be realised. A new control points will be installed concurrently. All plant items tested and commissioned by the manufacturers etc. The Tender will be computed in strict accordance with the Specification, however, where the Contractor wishes to put forward alternative equipment or method to that specified, notice in writing must be given at the time the Tender is submitted stating: • The alternative equipment or method proposed, and • The cost implications of the alternative submitted Should the alternatives although agreed by the Engineers prove of lower quality when installed than that specified, the Contractor shall revert to the original material or intent at their own cost.

Categories (CPV)

Similar open tenders

About Partners Procurement Service

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.