Skip to content
Tenfell
Closed tender
Published 15 May 2017

RSSB2593 - T995-01 - Revise and refine current locomotive gauge in GERT8073 Appendix N - Deadline Extended to July 21st

RAIL SAFETY AND STANDARDS BOARD LIMITED · London

Key facts

Estimated value
£75,000
Closing date
21 Jul 2017
Contract starts
20 Aug 2017
Contract ends
31 Aug 2018
Procedure
Open procedure
Buyer type
Utilities & transport

Description

THE TENDER END DATE FOR THIS PROJECT HAS BEEN EXTENDED TO FRIDAY 21st July 5PM

This work package (WP1) is part of project T995 - Development of a new locomotive gauge, which includes two Work Packages: T995-01 Revise and refine current locomotive gauge in GERT8073 Appendix N and T995-02 External Technical Expertise. This project T995 - Development of a new locomotive gauge has two work packages:

• Work Package 01- Revise and refine current locomotive gauge in GERT8073 Appendix N (described in this document)

• Work Package 02 - External Technical Expertise

This project follows on from previous projects to develop standard vehicle gauges, namely T977 - Development of a revised lower sector vehicle gauge and T978 Development of Passenger Standard Vehicle Gauges PG1 (20m) and PG2 (23m), which have already been delivered.

This research workstream supports the Vehicle/ Structure System Interface Committee's (V/S SIC's) long term Gauging strategy which aims to:

a) Maximise Capacity on Great Britain's Rail Network by adopting European size gauges/ vehicles over a core, nationwide network;

b) Define and implement standard infrastructure and vehicle gauges and provide an optimised Customer experience at the Platform Train Interface;

c) Lower Costs of gauging to the industry;

d) Contribute to Great Britain's reduction in Carbon emissions through modal shift.

This particular project (T995) looks at refining the current locomotive gauge so that it can be applied for both sides of the vehicle to infrastructure interface. The aim of the research is to have a matched loco/ infrastructure/ lower sector gauge family that will go 'nearly everywhere' with clear understanding and agreement of where a resultant compliant locomotive will not go and what the consequences/ costs/ benefits are of the resultant exception list of sites where the locomotive gauge has sub-standard clearance.

Categories (CPV)

Similar open tenders

About RAIL SAFETY AND STANDARDS BOARD LIMITED

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.