Mountbatten Building - Primary Chilled Water System Remedial Works (Planon Project 5844)
UNIVERSITY OF SOUTHAMPTON · South East
Key facts
- Estimated value
- £675,000
- Closing date
- 19 Apr 2017
- Contract starts
- 22 Jun 2017
- Contract ends
- 22 Jun 2022
- Procedure
- Restricted procedure
- Buyer type
- Education
Description
The University of Southampton is seeking to appoint a Contractor to deliver Primary Chilled Water System Remedial Works within the Mountbatten Building located on the Highfield Campus as outlined below: The original installation comprised two chillers, one being an absorption chiller (CH-21-101) and the second a screw chiller (CH-21-102), in 2012 a third screw chiller (CH-21-103) was installed as part of an earlier, but not entirely successful, remedial works project. The chiller plant has been plagued with poor operational performance which has led the University to obtain capital fund to replace/amend the primary cooling system. The scope of works associated with the replacement of the primary cooling system includes the following plant and equipment: a. Absorption Chiller (CH-21-101) with integral controls b. Screw chiller (CH-21-102) with integral controls c. Screw chiller (CH-21-103) with integral controls d. Cooling Towers (CTR-25-401 & 402) e. Primary Chilled Water Pumps (PMP-21-101, 102 & 103) f. Condenser Water Pumps PMP-25-201 & 202. g. Pressurisation Unit (MSC-21-101) h. Associated trend BEMS controls and condenser water pipework, chilled water pipework up to and including the primary flow and return headers and any other pipework etc. The project shall be to remove all redundant plant and equipment, to install as necessary new plant and equipment and carry out all necessary improvements to retained existing plant and equipment together with all associated builderswork etc. to create a complete new primary chilled water system that delivers chilled water to the low loss header in compliance with this specification and a subsequent associated Service Level Agreement (SLA). The Contractor shall be at liberty to reuse and incorporate into the amended installation any or all of the above existing components except for the Trend BEMS installation. The reason for not reusing the existing BEMS being that this will continue to control other existing plant outside of the new SLA. The Contractor shall be responsible for ensuring that any reused existing components are suitably repaired/modified/maintained to ensure that they can operate in a suitably reliable and efficient way to meet the conditions of the SLA for operation and maintenance of the primary chilled water system including but not limited to meeting Guaranteed Performance requirements. The tender returns will be assessed under a whole life-cycle cost analysis over a 10-year study period. The analysis will include the impact of proposed chiller efficiency at full and part load operation, associated plant (new and retained), maintenance and utility costs. A whole life cycle spreadsheet will be included within the tender documentation for the Contractor to complete. A performance specification and supporting drawings will be provided which outlines a suggested design only with key performance criteria, the tenderers will be encouraged...
Categories (CPV)
- 45331000 Heating, ventilation and air-conditioning installation work
- 51100000 Installation services of electrical and mechanical equipment
- 42500000 Cooling and ventilation equipment
- 45331200 Ventilation and air-conditioning installation work
- 45331100 Central-heating installation work
- 45331230 Installation work of cooling equipment
Similar open tenders
Door Entry Phased Replacement Programme 2026-27
Location: LondonBuyer: London Borough of Hillingdon
Open tenderCloses 2 Dec, 202627 daysValue £200.00kSource Find a TenderThe London Borough of Hillingdon (LBH) intends to install/upgrade the Door Entry/Access Control to 40 low and medium rise blocks. This work will be based on a planned program. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete and fully functional audio door
Crane Provision Framework
Location: South EastBuyer: KBS Maritime Ltd
Open tenderCloses 3 Dec, 202628 daysValue £4.00mSource Find a TenderKBS Maritime is seeking to establish a multi-supplier Framework for complete third-party crane services in support of Alongside Services operations. The Framework will supplement, not replace, KBS internal Heavy Lift capability and will provide planned surge, operational resilience, out-of-hours support, concurrent-lif
lumbing PPM and reactive repairs for Hertfordshire Police
Location: East of EnglandBuyer: The Police and Crime Commissioner for Hertfordshire
Open tenderCloses 3 Dec, 202628 daysValue £371.50kSource Find a Tenderlumbing PPM and reactive repairs for Hertfordshire Constabulary
Allotment Track Repairs
Location: South EastBuyer: Gosport Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £65.00kSource Find a TenderGBC is inviting quotations for the supply, delivery and installation of track repairs at Brockhurst Allotment, Manor Way Allotment, and Middlecroft Allotment.
UKREiiF Stand Design and Build
Location: ScotlandBuyer: Glasgow City Council
Open tenderCloses 9 Dec, 202634 daysValue £150.00kSource Public Contracts ScotlandGlasgow City Council is seeking to appoint a company to design, build and deliver an exhibition stand on behalf of Invest Glasgow at The UK’s Real Estate Investment and Infrastructure Forum (UKREiiF) for the next three years. In 2027, the event will take place in the Royal Armouries Museum in Leeds, from 18-20th May. F
Electrical Rewire and associated work at Duncan Mills Memorial Slipway in Balloch
Location: ScotlandBuyer: Loch Lomond & The Trossachs National Park Authority
Open tenderCloses 7 Dec, 202632 daysValue £100.00kSource Public Contracts ScotlandElectrical Rewire and associated work at Duncan Mills Memorial Slipway in Balloch