Refurbishment of Elizabeth Tower
Key facts
- Contract value
- £27,904,057
- Awarded
- 28 Sep 2017
- Contract starts
- 01 Oct 2017
- Contract ends
- 28 Feb 2020
- Procedure
- Competitive procedure with negotiation (above threshold)
- Buyer type
- Other public body
Awarded to
| Supplier | Value |
|---|---|
| Sir Robert McAlpine Ltd | £27,904,057 |
Description
The Corporate Officer of the House of Lords and The Corporate Officer of The House of Commons are undertaking key internal conservation and refurbishment works to the Elizabeth Tower, including waterproofing and addressing condensation problems as well as modernising the building to improve standards in safety, access and visitor and workspace facilities.
Completed in 1856, the Elizabeth Tower was constructed using 2600 cubic metres of brick and 850 cubic metres of stone, all of which were transported to Westminster by river. Designed by architects Charles Barry and Augustus Pugin, it took over 13 years to build. Renamed Elizabeth Tower in 2012, to honour the Queen's Diamond Jubilee, it is regularly featured in popular culture and is one of the most photographed landmarks in the world.
Background & Works to Date To ensure that the UK's most famous clock continues to keep time, specialist teams carry out regular maintenance and adjustments to the Great Clock. However, it has now been over 31 years since the last extensive works were carried out to maintain the Elizabeth Tower.
Problems have been identified with the clock hands, mechanism and pendulum, which need to be dealt with immediately to ensure that the clock can continue to work properly. Identified areas of concern include cracks in masonry, leaks, erosion, and rusting of metalwork. There is a risk that if not addressed shortly the clock may fail or fabric problems may become acute.
In addition, the Tower needs to be brought in line with fire prevention guidance and health and safety measures for staff and visitors need to be improved. In order to provide a better means of emergency evacuation, a lift will also be installed inside the tower, which will also provide access for maintenance.
The last significant conservation work was completed in 1983-85. This involved the cleaning and repair of the stone, painting and gilding works and repairs to the cast iron roof. The structure was stabilised in 1995/96 as a result of works carried out to the Jubilee Line. Parts of the clock mechanism were serviced in 2007, but other areas haven't been overhauled in over 25 years.
Project Objectives
⢠Work to prevent the clock mechanism from failing ⢠Addressing problems caused by decay to the fabric of the building. ⢠Health & safety and fire safety improvements, including installation of a lift. ⢠Enhanced energy efficiency through modern lighting of the tower face and other measures. Overall the project's aim is to conserve the Tower for future generations.
The scope of this project includes:
⢠Facilitating Works to the Clock (Servicing of the Clock Mechanism to be carried out by Parliamentary Estates Clock Mechanics). ⢠Scaffolding/Access. ⢠Redecoration of the Cast Iron Roofs. ⢠Refurbishment of the Ayrton Light. ⢠Refurbishment of the Clock Faces and Hands. ⢠Stonework Repair. ⢠Structural Repairs and Waterproofing. ⢠Installation of a Lift. ⢠Internal refurbishment.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Roof replacement and associated works at Cork College of FET St Gobans College, Seskin, Bantry, Co Cork.
Location: IrelandBuyer: Cork Education and Training Board
Open tenderCloses 20 Nov, 202615 daysValue €2.00MSource TEDRoof replacement works, rooflights replacement, high level windows replacement, and all associated works.
Cuireadh chun Tairisceana: láithreán a dhiúscairt chuig Comhlacht Ceadaithe Tithíochta do thithíocht inacmhainne/Invitation to Tender: site disposal to an Approved Housing Body for affordable housing
Location: IrelandBuyer: Údarás Na Gaeltachta
Open tenderCloses 4 Dec, 202629 daysValue €150.00KSource TEDCuireadh chun Tairisceana chun láithreán a dhiúscairt go dtí Comhlacht Ceadaithe Tithíochta a d’fhéadfaí cóiríocht chónaithe inacmhainne, a d’fhéadfaí a thógáil, a dhíol agus a léasú, a chur ar fáil do Chainteoirí Gaeilge sna Doirí Beaga (Gaoth Dobhair), Co. Dhún na nGall d’Údarás na Gaeltachta. Invitation to Tender fo
Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council
Location: IrelandBuyer: Dublin City Council
Open tenderCloses 4 Dec, 202629 daysValue €48.00MSource TEDDublin City Council Housing Maintenance Section manages the repair and maintenance of the council's residential housing stock. Housing Maintenance Section serves 11 Housing Areas: Ballymun-Finglas, Artane-Whitehall, Donaghmede, Clontarf, Cabra-Glasnevin, North Inner City, South West Inner City, South East Inner City, B
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202643 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved