Skip to content
Tenfell
Closed tender
Published 16 Jun 2017

GB-Chertsey: Ramp Demolition and Creation of Car Parks -Fee proposal for Design Team / Lead Design Service

ASPH NHS Foundation Trust

Key facts

Estimated value
£50,000
Closing date
30 Jun 2017
Contract starts
20 Aug 2017
Contract ends
12 Jan 2019
Procedure
Not specified
Buyer type
Health

Description

NOTE: This notice was updated on 16 June 2017 for the following reason: Added - Inclusion in Contracts FinderThe Ramp buildings date back to the1940s and are temporary buildings. These buildings are well beyond their anticipated life span, and have been identified in the Trust 6 Facet Survey as Poor / requiring high cost investment and are energy inefficient. Due to the complexities of demolishing the entire Ramp, the Ramp has been designated in two sections: Upper and Lower Ramp. The Lower Ramp was demolished in 2011/12, and the space was used to create a staff car park. Ashford and St Peter's NHS Foundation Trust (The Trust) now wishes to demolish the Upper Ramp and create space for the Trust future developments. The proposed works involves the careful demolition of Block 46, 50, 51, local Boiler Plant room and associated ramp corridor. It also includes services diversion for Bock 54, Asbestos removal, construction of car parks, provision of works compound and an access route for the new Urgent Care and Assessment Block, together with improvement of the road network.

Scope of the project

•Provision and maintenance of utilities to Block 54 until 2020/21; •Diversion of all services currently routed through the Ramp; •Demolition of Block 46, 50, 51, local Boiler Plant Room and associated ramp corridor as far as the fire doors in the corridor linking Level 2 DOK and PEW; •Grading of the released land and formation of a new 90-spaces tarmacked visitor car park; •Levelling the sloped green area in the main staff car park and designing a new layout for the staff cark park; •Closure of Hazel Car Park at the end of this project; this car park will be used as a contractor works compound for building the new UCAA Block; •Additional external lighting. Please refer to the attached project brief for more details.

Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

Categories (CPV)

Similar open tenders

About ASPH NHS Foundation Trust

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.