NML China's First Emperor and Terracotta Warrior Building Works
Key facts
- Contract value
- £74,467
- Awarded
- 01 Oct 2017
- Contract starts
- 08 Oct 2017
- Contract ends
- 04 Dec 2017
- Procedure
- Open procedure (below threshold)
- Buyer type
- Other public body
Awarded to
| Supplier | Value |
|---|---|
| Cunningham Brown Limited | £74,467 |
Description
Bidders are asked to submit a formal tender for the "NML China's First Emperor and the Terracotta Warrior Building Works" for the back of house areas.
National Museums Liverpool (NML) is seeking a building contractor to carry out works in a number of back of house areas that support the main exhibition. This includes carry out works to provide a queuing hall for visitors, providing a refurbishment of space which will be used as areas to introduce the exhibition, refurbish and upgrade back of house areas which will be used a visitor routes into the main exhibition space, stripping out gallery spaces to allow for fit-out works and create school lunch area on 5th floor.
Works comprise of internal decoration to walls, and ceilings, installation of new flooring, and cleaning of existing flooring, forming of new wall partition and doorways, strip out of gallery spaces in preparation of Fit-Out works. Within the programme of works, the building contractor will need to liaise with other contractors on site, such as HVAC/M&E contractors and NML delivery team. The exhibition will be one of the major cultural events in the UK in 2018 and will run from early February 2018 to end of October 2018. It will comprise a loan of internationally important artefacts, including Class A relics, from Shaanxi Province, China. The exhibition is being curated, designed and produced by National Museums Liverpool's in-house teams with assistance from a guest curator.
The exhibition will comprise of traditional exhibition displays of artefacts - both cased and on open display (subject to approval) alongside multimedia immersive interpretation and AV (external contractors).
The exhibition will occupy most of the second floor of the World Museum which will also house a suite of exhibition-related visitor facilities including ticket verification, a shop and a Welcome Centre. Logistics and visitor flows within the venue both during exhibition build and installation are key; as is access to the rest of the 5 floor of the museum which will remain open to our usual visitors. Minimal disruption to the rest of the museum, while coping with increased foot fall is critical.
The export licence will be signed in September/October 2017. It is only at that stage that tickets can be sold and the final list of objects and images can be released to the public.
For clarification whilst preparing tender. Partitioning If preferred the new partitioning can be formed using metal studding provided it is as rigid as timber studwork.
School room The school room 2nd floor referred to in the programme is the school drop off room at the back of the current temporary exhibition room.
Redecoration. Allow for four top coats of paint to green wall areas.
Carpets Cleaning - allow for 780m2 of carpet cleaning New carpets - Allow for 410m2 for new carpet covering the - Old Entrance, William Brown Room, Link corridor and to 200m2 for the proposed shop and video room.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Roof replacement and associated works at Cork College of FET St Gobans College, Seskin, Bantry, Co Cork.
Location: IrelandBuyer: Cork Education and Training Board
Open tenderCloses 20 Nov, 202615 daysValue €2.00MSource TEDRoof replacement works, rooflights replacement, high level windows replacement, and all associated works.
Cuireadh chun Tairisceana: láithreán a dhiúscairt chuig Comhlacht Ceadaithe Tithíochta do thithíocht inacmhainne/Invitation to Tender: site disposal to an Approved Housing Body for affordable housing
Location: IrelandBuyer: Údarás Na Gaeltachta
Open tenderCloses 4 Dec, 202629 daysValue €150.00KSource TEDCuireadh chun Tairisceana chun láithreán a dhiúscairt go dtí Comhlacht Ceadaithe Tithíochta a d’fhéadfaí cóiríocht chónaithe inacmhainne, a d’fhéadfaí a thógáil, a dhíol agus a léasú, a chur ar fáil do Chainteoirí Gaeilge sna Doirí Beaga (Gaoth Dobhair), Co. Dhún na nGall d’Údarás na Gaeltachta. Invitation to Tender fo
Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council
Location: IrelandBuyer: Dublin City Council
Open tenderCloses 4 Dec, 202629 daysValue €48.00MSource TEDDublin City Council Housing Maintenance Section manages the repair and maintenance of the council's residential housing stock. Housing Maintenance Section serves 11 Housing Areas: Ballymun-Finglas, Artane-Whitehall, Donaghmede, Clontarf, Cabra-Glasnevin, North Inner City, South West Inner City, South East Inner City, B
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202643 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved