University of Sunderland - National Glass Centre - Boiler Replacement

University of Sunderland · North East

Key facts

Closing date
03 Jul 2020
Contract starts
02 Aug 2020
Contract ends
11 Sep 2020
Procedure
Open procedure (below threshold)
Buyer type
Education

Description

Specification for Authority

The works consist of replacing the existing boiler, flue, pumps, controls and associated equipment. To enable new boiler plant to be installed, existing equipment shall be stripped out as shown and described in this document and on the drawings. The existing boiler plant must remain in operation throughout the works until the final switch over. The main contractor shall be the mechanical contractor and should allow for all works necessary to complete the project, including builders work, electrical works, any structural input required, approvals, issuing of all necessary documentation and notifications. In addition to the new boiler plant, electric water heaters shall be installed, and the existing centralised hot water system stripped out/back. All works are described on the drawings and within the specifications.

Additional information: Expression of interest and tender documents via the University of Sunderland E-Portal. https://in-tendhost.co.uk/universityofsunderland/aspx/Home

Is a Recurrent Procurement Type? : No

Categories (CPV)

Similar open tenders

About University of Sunderland

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.