Key facts
- Contract value
- £27,640
- Awarded
- 06 Sep 2020
- Contract starts
- 13 Sep 2020
- Contract ends
- 23 Oct 2020
- Procedure
- Open procedure (below threshold)
- Buyer type
- Central government
Awarded to
| Supplier | Value |
|---|---|
| VEL Facilities Management Ltd | £27,640 |
Description
This project of minor enabling works is located at the Canning Graving Docks. It is currently an unrealised focal point within the heart of Liverpool's maritime World Heritage Site. Over the course of the next ten years, our vision is to develop this spectacular eighteenth-century dockland to create a modern visitor destination.
The Canning Graving Dock quaysides are currently inaccessible, with waste building materials stored across the site and fencing restricting public access. This project is aimed at clearing the largest quay of materials and debris, replacement of heras and low level crowd barriers surrounding the quayside perimeter, the design and installation of temporary lighting, repair of loose or missing setts, and preparing the site for any future works. The site must be cleared and safe to use by the public by the October 2020.
These works are the first phase of minor enabling works, and whilst the lighting and fencing are temporary interventions, they must be robust enough to withstand wind loading and vandalism, and operate for the duration of time until the next phase of works may be undertaken.
In light of the Covid-19 pandemic, clearing the site and opening up to the public once more is all the more pressing. Having the site open for visitors to enjoy will also provide opportunities to hold events and commercial activities, which will assist NML in the recovery period.
NML seeks a contractor to undertake the enabling works at the Canning Graving Dock quayside. The works will involve the following areas: site preparation, fencing, lighting and interpretation display stands.
The site preparation will include the removal of building materials from site, clearing all loose debris and repairing any loose or missing granite setts. Surplus sets are located onsite and available to use for remedial works.
Access to the site is currently restricted by low level crowd barriers and heras fencing, which have been in situ for some time. Several fencing sections have become damaged and additional sections are required. The contractor will be required to remove parts of the existing fencing/ barrier sections and replacing with low level pedestrian barrier throughout the perimeter of the largest quay. The barrier must be braced and anchored to the ground to prevent any movement from wind loading or interference by people. The barrier must provide adequate restraint from the steep drop into the Graving Dock basin one the one side, and the Canning Half Tide Dock to the other side. There is also a railing situated between the Lusitania propeller and the Carters Horse monument which must be removed, and the ground made good.
These works are aimed at enabling public access and any future developments to the site which we may undertake. Works must be complete by the end of summer to enable public access by the October half term 2020.
Categories (CPV)
- 45000000 Construction work
Similar open tenders
Acle Bridge toilet block access, landscaping and drainage improvements
Location: East of EnglandBuyer: Broads Authority
Open tenderCloses 3 Dec, 202628 daysValue £100.00kSource Find a TenderThe Broads Authority is seeking a suitably qualified and experienced contractor to carry out access, landscaping and drainage improvement works at our Acle Bridge toilet block. The works will involve breaking up and removing existing surfacing, raising ground levels, installing new paving and creating sloped access poi
Door Entry Phased Replacement Programme 2026-27
Location: LondonBuyer: London Borough of Hillingdon
Open tenderCloses 2 Dec, 202627 daysValue £200.00kSource Find a TenderThe London Borough of Hillingdon (LBH) intends to install/upgrade the Door Entry/Access Control to 40 low and medium rise blocks. This work will be based on a planned program. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete and fully functional audio door
Crane Provision Framework
Location: South EastBuyer: KBS Maritime Ltd
Open tenderCloses 3 Dec, 202628 daysValue £4.00mSource Find a TenderKBS Maritime is seeking to establish a multi-supplier Framework for complete third-party crane services in support of Alongside Services operations. The Framework will supplement, not replace, KBS internal Heavy Lift capability and will provide planned surge, operational resilience, out-of-hours support, concurrent-lif
lumbing PPM and reactive repairs for Hertfordshire Police
Location: East of EnglandBuyer: The Police and Crime Commissioner for Hertfordshire
Open tenderCloses 3 Dec, 202628 daysValue £371.50kSource Find a Tenderlumbing PPM and reactive repairs for Hertfordshire Constabulary
Allotment Track Repairs
Location: South EastBuyer: Gosport Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £65.00kSource Find a TenderGBC is inviting quotations for the supply, delivery and installation of track repairs at Brockhurst Allotment, Manor Way Allotment, and Middlecroft Allotment.
UKREiiF Stand Design and Build
Location: ScotlandBuyer: Glasgow City Council
Open tenderCloses 9 Dec, 202634 daysValue £150.00kSource Public Contracts ScotlandGlasgow City Council is seeking to appoint a company to design, build and deliver an exhibition stand on behalf of Invest Glasgow at The UK’s Real Estate Investment and Infrastructure Forum (UKREiiF) for the next three years. In 2027, the event will take place in the Royal Armouries Museum in Leeds, from 18-20th May. F