Redevelopment of University Station

West Midlands Combined Authority · West Midlands

Key facts

Awarded
03 Aug 2020
Contract starts
06 Sep 2020
Contract ends
01 Aug 2022
Procedure
Competitive procedure with negotiation (above threshold)
Buyer type
Local government

Awarded to

SupplierValue
VOLKERFITZPATRICK LIMITED—

Description

University Station was built in the 1970s as part of the introduction of the Cross-City Line. The station was designed for approximately 400,000 passengers per annum and, except for some modifications in the 1990s during electrification, has remained fairly untouched since. Today the station is used by over 3 million passengers per year, with numbers expected to reach over 7 million passengers by 2043.

To meet these increased capacity requirements and offer an improved passenger experience, it is anticipated (based on current scope) the project shall deliver:

(a) A new station entrance building at the Birmingham end of the station site with an integral footbridge link to Platform 2 where there will be a second pavilion building; (b) Lift access on both platforms; (c) Platform widening; (d) A bridge crossing the canal that links the platform 2 pavilion to the University of Birmingham campus; (e) Public realm area linking the existing station to the new entrance and which includes the pick-up / drop-off and cycle storage facilities; and (f) Refurbishment of the existing station building to act as an exit only.

To bid on the opportunity, please do so on BravoSolution using the following link https://wmca.bravosolution.co.uk.

Categories (CPV)

Similar open tenders

About West Midlands Combined Authority

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.