Skip to content
Tenfell
Closed tender
Published 07 Oct 2020

Heat Flux Sensors

University of Salford · North West

Key facts

Estimated value
£30,000
Closing date
21 Oct 2020
Contract starts
01 Nov 2020
Contract ends
31 Oct 2021
Procedure
Open procedure (below threshold)
Buyer type
Education

Description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energyhouse ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features: • 2 large chambers capable of having 2 family homes built in each one (4 homes in total) • Temperature controlled to within 0.5 °C from -20°C to +40 °C • Wind, rain, solar radiation and snow can be generated • These conditions provide testing facilities for housing covering 95% of the global population. The Energy House 2 Project has a requirement to monitor heat flow through wall, floors, roofs, doors and ceilings. This is generally done using heat flux sensors. For full tender documentation please go to our InTend portal.

Additional information: Please send all correspondence to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home

Categories (CPV)

Similar open tenders

About University of Salford

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.