Skip to content
Tenfell
Closed tender
Published 28 Aug 2020

Demolition of existing and construction of new Control Room and VE temporary rest spaces

The Royal Air Force Museum · United Kingdom

Key facts

Estimated value
£1
Closing date
11 Sep 2020
Contract starts
19 Sep 2020
Contract ends
16 Oct 2020
Procedure
Open procedure (below threshold)
Buyer type
Central government

Description

The RAF Museum's existing security control room needs to be relocated for operational and safety reasons. The Museum requires the services of others to create and enable a space to house the new control room operations, pending a relocation thereafter. The works tendered here encompasses the base construction works to form the space, the infrastructure including heating, cooling, ventilation, hot and cold water services, small power, reserve power, lighting and emergency lighting and smoke detection. The construction works will form a two compartment secure control room with attendant WC and kitchen facilities as well as a neighbouring rest area.

The migration of systems are excluded from these base works although there will be some ancillary attendant works such as door control power supply which will be covered by a provisional sum.

Tender returns are required by email by 12 noon on Friday the 11th September 2020 to [email protected] with a planned completion date of 12th October 2020.

Categories (CPV)

Similar open tenders

About The Royal Air Force Museum

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.