Skip to content
Tenfell
Closed tender
Published 01 Feb 2020

Forestry England - Whinlatter Hydroelectric Power Scheme

Forestry Commission · South West

Key facts

Closing date
04 Mar 2020
Contract starts
24 May 2020
Contract ends
24 May 2025
Procedure
Open procedure
Buyer type
Central government

Description

Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted planning permission, consisting of an inlet structure, penstock, turbine house and outlet, with electrical connections into both the Whinlatter Visitor Centre and into Thornthwaite, for export to the National Grid. Detailed design is currently in progress for the overall scheme with the turbine specification and requirements set out below. This tender is for the award of a Contract for the design, manufacture, supply, installation, commissioning and the planned and reactive maintenance of a suitable turbine. The maintenance service will be for an initial period of five years post commissioning.

Categories (CPV)

Similar open tenders

About Forestry Commission

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.