Skip to content
Tenfell
Closed tender
Published 21 Feb 2020

Traffic Control System - Creighton Road Corridor

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

Key facts

Estimated value
£150,000
Closing date
05 Mar 2020
Contract starts
27 Aug 2020
Contract ends
27 Dec 2024
Procedure
Competitive quotation (below threshold)
Buyer type
Other public body

Description

Design Considerations

Location Creighton/Greatmoor Road is an existing private access road to the FCC Energy from Waste (EfW) plant from the A41, as indicated on the location plan below.

Traffic flows The objective of the traffic signalling system design/installation is to control HGV vehicles using Creighton/Greatmoor Road so that the capacity can be increased to accommodate an EK requirement of an additional 100no. HS2 HGV's per day (peak) over the FCC HGV planning limit (600no. per day) - see traffic modelling reports referenced in item 1.1. In addition, there is a requirement to accommodate a relatively small volume of FCC/EK LGV vehicles that will be accessing the site offices at the north end of this section of road (50no. vehicles/day arriving between 7 and 9am and leaving between 4 and 6pm).

Site Constraints The site is an historic railway embankment that was converted to an access road for the FCC Energy from Waste (EfW) site in 2014. The width restriction was applied to preserve the hedges/vegetation eg. Hawthorn growing along the sides of the corridor as it forms an important habitat for bats and Black Hairstreak butterflies. Therefore, the design of the traffic signalling system must be sympathetic to the location by limiting groundworks or de-vegetation. From the traffic modelling reports it is not envisaged that there is a requirement to extend or provide additional passing bays and that any site works will be limited to the installation of the traffic signalling system. It will not be possible to close the road to FCC deliveries, however if absolutely necessary it should be possible by prior agreement with FCC to do installation work at the weekend when they are not operating. This area is included in the Bernwood Bat licence area and so to be sympathetic to the environment dawn and dusk working for the installation of this equipment should be avoided where possible.

Monitoring and External reporting In developing the traffic signalling scheme, provision will need to be made for the following items to be monitored: - Monitoring vehicles passing Red signals - Monitoring back-up and waiting times of vehicles at South end towards A41 - Monitoring journey times for vehicles travelling through the traffic signal-controlled corridor - Monitoring failure of equipment - Self-reporting of failures in equipment/operation to the EK Logistics team (if it is reporting to logistics or some sort of automatic signage on the A41, it is important that there is a mechanism to stop vehicles accessing off of the A41 if there is already a problem. This may not be possible, and it may be a procedure/briefing to drivers not to enter the access road if it has backed up to the A41, because we cannot afford to block traffic there with vehicles queueing).

Design life The design standards may dictate a minimum design life to be c

Additional information: N/A

Categories (CPV)

Similar open tenders

About Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.